The report concludes that the Barossa gas project is unviable because it produces some of the dirtiest gas in Australia and relies on an unapproved CCS plan that is unlikely to significantly reduce emissions.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • The Full Federal Court of Australia overturned approvals for the $4.7 billion Barossa offshore gas project because Santos failed to adequately consult with Traditional Owners, specifically the Tiwi plaintiff.
  • Barossa gas is identified as the dirtiest gas used for LNG in Australia, with a carbon dioxide content of 18 volume percent, which is three times higher than the Bayu-Undan gas and six times higher than gas processed in the NWS LNG plant in WA.
  • The project's emissions intensity is estimated at 1.5 tonnes of CO2 per tonne of LNG, which is approximately double the average for the Australian LNG industry.
  • The total CO2 emissions for the project were estimated at about 5.4 million tonnes per year, representing approximately 1.2% of Australia's total greenhouse gas emissions as of March 2022.
  • The proposed Bayu-Undan CCS project, which Santos claims could store up to 10 million tonnes of CO2 per year, lacks approval from the Northern Territory government, NOPSEMA, and the Timor-Leste government.
  • The report asserts that CCS is unlikely to reduce emissions significantly because the energy required to compress and move CO2 over 800km in the Timor Sea would increase the volume of dirty gas used.
  • The Bayu-Undan CCS scheme is described as considerably more complex than Chevron's Barrow Island project due to the 500km offshore pipeline through warm tropical waters, which risks the arrival of liquid 'slugs' at the receiving platform.

Cite the original document

APA
Robert, J. (2022). Santos Loss Forces Them Back to The Drawing Board on Unapproved Barossa Gas Project. Institute for Energy Economics and Financial Analysis. https://ieefa.org/sites/default/files/2022-12/Santos%E2%80%99%20Loss%20Forces%20Them%20Back%20to%20The%20Drawing%20Board%20on%20Unapproved%20Barossa%20Gas%20Project_Dec%202022%20%281%29.pdf
Chicago
Robert, John. Santos Loss Forces Them Back to The Drawing Board on Unapproved Barossa Gas Project. Institute for Energy Economics and Financial Analysis, 2022. https://ieefa.org/sites/default/files/2022-12/Santos%E2%80%99%20Loss%20Forces%20Them%20Back%20to%20The%20Drawing%20Board%20on%20Unapproved%20Barossa%20Gas%20Project_Dec%202022%20%281%29.pdf.
Wikipedia
{{cite report |last1=Robert |first1=John |title=Santos Loss Forces Them Back to The Drawing Board on Unapproved Barossa Gas Project |publisher=Institute for Energy Economics and Financial Analysis |date=December 2022 |url=https://ieefa.org/sites/default/files/2022-12/Santos%E2%80%99%20Loss%20Forces%20Them%20Back%20to%20The%20Drawing%20Board%20on%20Unapproved%20Barossa%20Gas%20Project_Dec%202022%20%281%29.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document ieefa-001920)}}
BibTeX
@techreport{robert2022santos, author = {Robert, John}, title = {{Santos Loss Forces Them Back to The Drawing Board on Unapproved Barossa Gas Project}}, institution = {Institute for Energy Economics and Financial Analysis}, year = {2022}, month = dec, url = {https://ieefa.org/sites/default/files/2022-12/Santos%E2%80%99%20Loss%20Forces%20Them%20Back%20to%20The%20Drawing%20Board%20on%20Unapproved%20Barossa%20Gas%20Project_Dec%202022%20%281%29.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document ieefa-001920} }

Full text