Rooftop Solar Lagging: Why India Will Miss Its 2022 Solar Target

Report an error

Summary

AI-generated

This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.

Learn more about AI enrichment

India is projected to miss its 2022 target of 100GW of installed solar capacity by approximately 27%, primarily due to a 25GW shortfall in rooftop solar installations.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • India is projected to miss its 2022 target of 100GW of installed solar capacity by approximately 27%, with a total shortfall of 27GW. This is composed of a 25GW shortfall from the 40GW rooftop solar target and a minor 1.8GW shortfall from the 60GW utility-scale solar target.
  • On the current trajectory, India is expected to miss its 2030 solar target of 300GW by approximately 86GW.
  • The utility-scale solar segment has performed well, contributing 42GW of the 55GW commissioned capacity as of December 2021 and is expected to achieve nearly 97% of its 60GW target by the end of 2022.
  • Rooftop solar has severely underperformed, with only about a quarter of the 40GW target achieved by 2021. By December 2022, it is expected to reach 15GW, leaving a 25GW shortfall.
  • Several regulatory and policy barriers impede solar growth, including the imposition of basic customs duty (BCD) on imported cells and modules, the Approved List of Models and Manufacturers (ALMM) restrictions, and inconsistent net metering and banking regulations across states.
  • Financial challenges for Micro, Small & Medium Enterprises (MSMEs) include excessive loan turnaround times (up to three to six months), high interest rates exceeding 14%, and a lack of non-collateralised finance schemes.
  • Gujarat's Surya Urja Rooftop Yojana has been a successful state-level model, enabling Gujarat to achieve the highest cumulative rooftop installed capacity in India at approximately 1.6GW through subsidies of 20% to 40%.

Cite the original document

APA
Gulia, J., Garg, V., & Thayillam, A. (2022). Rooftop Solar Lagging: Why India Will Miss Its 2022 Solar Target. Institute for Energy Economics and Financial Analysis. https://ieefa.org/sites/default/files/2022-05/Rooftop%20Solar%20Lagging_Why%20India%20Will%20Miss%20Its%202022%20Solar%20Target_April%202022.pdf
Chicago
Gulia, Jyoti, Vibhuti Garg, and Akhil Thayillam. Rooftop Solar Lagging: Why India Will Miss Its 2022 Solar Target. Institute for Energy Economics and Financial Analysis, 2022. https://ieefa.org/sites/default/files/2022-05/Rooftop%20Solar%20Lagging_Why%20India%20Will%20Miss%20Its%202022%20Solar%20Target_April%202022.pdf.
Wikipedia
{{cite report |last1=Gulia |first1=Jyoti |last2=Garg |first2=Vibhuti |last3=Thayillam |first3=Akhil |title=Rooftop Solar Lagging: Why India Will Miss Its 2022 Solar Target |publisher=Institute for Energy Economics and Financial Analysis |date=April 2022 |url=https://ieefa.org/sites/default/files/2022-05/Rooftop%20Solar%20Lagging_Why%20India%20Will%20Miss%20Its%202022%20Solar%20Target_April%202022.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document ieefa-001913)}}
BibTeX
@techreport{gulia2022rooftop, author = {Gulia, Jyoti and Garg, Vibhuti and Thayillam, Akhil}, title = {{Rooftop Solar Lagging: Why India Will Miss Its 2022 Solar Target}}, institution = {Institute for Energy Economics and Financial Analysis}, year = {2022}, month = apr, url = {https://ieefa.org/sites/default/files/2022-05/Rooftop%20Solar%20Lagging_Why%20India%20Will%20Miss%20Its%202022%20Solar%20Target_April%202022.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document ieefa-001913} }

Full text

Collected · Record updated