Review of LNG Canada Project: Delays, Policy Changes, and Rising Costs

Report an error

Summary

AI-generated

This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.

Learn more about AI enrichment

The report finds that LNG Canada's economic profile has deteriorated since its 2018 investment decision, potentially turning the project into a 'financial albatross' due to rising infrastructure costs and an expected oversupply of LNG in Asia by 2026.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • The LNG Canada project's economic viability is threatened by significant cost increases for the Coastal GasLink (CGL) pipeline, which rose from an original estimate of $4.2 billion to $5.1 billion due to permit delays, scope changes, and COVID-19 restrictions.
  • The Coastal GasLink pipeline faces severe financial risk; IEEFA estimates that if construction costs rise by another 15%, the project's net present value (NPV) becomes negative, which could lead TC Energy to abandon development contracts.
  • LNG Canada's integrated business model is at risk because its sponsors produce approximately 36% less gas than the project requires, and production is further hampered by high decline rates in unconventional BC Montney wells, which average a 55% drop from initial 30-day production within 18 months.
  • The project is likely to enter an oversupplied Asian LNG market in 2025-2026, with 100 MTPA of new capacity coming online between 2023 and the project's completion, potentially depressing long-term prices to a range of $7.47 to $7.72/MMBtu.
  • While LNG Canada claims low emissions, accounting for the dedicated GHG emissions from the CGL pipeline and upstream production doubles the emissions per ton of LNG exported to 0.30 tons, which would increase total GHG emissions in British Columbia by another 7%.

Cite the original document

APA
Mawji, O., & Williams, B. (2021). Review of LNG Canada Project: Delays, Policy Changes, and Rising Costs. Institute for Energy Economics and Financial Analysis. https://ieefa.org/sites/default/files/2022-02/Review-of-LNG-Canada-Project-Delays-Policy-Changes-and-Rising-Costs_November-2021.pdf
Chicago
Mawji, Omar, and Brad Williams. Review of LNG Canada Project: Delays, Policy Changes, and Rising Costs. Institute for Energy Economics and Financial Analysis, 2021. https://ieefa.org/sites/default/files/2022-02/Review-of-LNG-Canada-Project-Delays-Policy-Changes-and-Rising-Costs_November-2021.pdf.
Wikipedia
{{cite report |last1=Mawji |first1=Omar |last2=Williams |first2=Brad |title=Review of LNG Canada Project: Delays, Policy Changes, and Rising Costs |publisher=Institute for Energy Economics and Financial Analysis |date=November 2021 |url=https://ieefa.org/sites/default/files/2022-02/Review-of-LNG-Canada-Project-Delays-Policy-Changes-and-Rising-Costs_November-2021.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document ieefa-001893)}}
BibTeX
@techreport{mawji2021review, author = {Mawji, Omar and Williams, Brad}, title = {{Review of LNG Canada Project: Delays, Policy Changes, and Rising Costs}}, institution = {Institute for Energy Economics and Financial Analysis}, year = {2021}, month = nov, url = {https://ieefa.org/sites/default/files/2022-02/Review-of-LNG-Canada-Project-Delays-Policy-Changes-and-Rising-Costs_November-2021.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document ieefa-001893} }

Full text

Collected · Record updated