Renewable Energy Tenders Issuance in India Not in Tandem With Government Targets

Report an error

Summary

AI-generated

This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.

Learn more about AI enrichment

Renewable energy tenders in India have fallen from 40GW in 2019 to 28GW in 2022, a rate insufficient to meet the government's 2030 climate targets. The decline is primarily driven by the poor financial health of distribution companies (DISCOMs), rising equipment costs, and a shift in demand toward firm, round-the-clock power over simple solar and wind projects.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • Annual issuance of variable renewable energy (VRE) tenders in India decreased from 40GW in 2019 to approximately 28GW in 2022, which is below the 30-35GW of new annual capacity required to reach 2030 targets.
  • Distribution companies (DISCOMs) are shifting away from 'plain vanilla' solar and wind projects due to intermittency, preferring 'new-age' tenders such as wind-solar hybrids, round-the-clock (RTC) power, and renewables coupled with energy storage.
  • The financial instability of state DISCOMs, characterized by significant payment dues and attempts to renegotiate existing power purchase agreements (PPAs), has led to tender undersubscription and reduced developer confidence.
  • Rising project costs, driven by a 62% increase in the price of MONO PERC solar modules and the imposition of Basic Customs Duty (BCD) and the Approved List of Module Manufacturers (ALMM), have diminished the risk appetite of developers.
  • Reverse auctions have encouraged overly aggressive bidding that threatens project viability; consequently, the Indian government is considering replacing them with closed bidding for wind tenders to discover more realistic tariffs.
  • Some renewable-energy-rich states, specifically Karnataka and Andhra Pradesh, have significantly slowed their tender issuance because they have already achieved their renewable purchase obligation (RPO) targets.
  • Despite the growth of renewables, India maintains a sustained reliance on coal, with approximately 26GW of new coal projects under construction as of 2022, which creates a deterrent for renewable energy tender activity.

Cite the original document

APA
Gulia, J., Sharma, P., & Garg, V. (n.d.). Renewable Energy Tenders Issuance in India Not in Tandem With Government Targets. Institute for Energy Economics and Financial Analysis. https://ieefa.org/sites/default/files/2023-03/Renewable%20Energy%20Tenders%20Issuance%20in%20India%20not%20in%20tandem%20goverment%20targets-Feb2023.pdf
Chicago
Gulia, Jyoti, Prabhakar Sharma, and Vibhuti Garg. Renewable Energy Tenders Issuance in India Not in Tandem With Government Targets. Institute for Energy Economics and Financial Analysis, n.d. https://ieefa.org/sites/default/files/2023-03/Renewable%20Energy%20Tenders%20Issuance%20in%20India%20not%20in%20tandem%20goverment%20targets-Feb2023.pdf.
Wikipedia
{{cite report |last1=Gulia |first1=Jyoti |last2=Sharma |first2=Prabhakar |last3=Garg |first3=Vibhuti |title=Renewable Energy Tenders Issuance in India Not in Tandem With Government Targets |publisher=Institute for Energy Economics and Financial Analysis |url=https://ieefa.org/sites/default/files/2023-03/Renewable%20Energy%20Tenders%20Issuance%20in%20India%20not%20in%20tandem%20goverment%20targets-Feb2023.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document ieefa-001875)}}
BibTeX
@techreport{guliandrenewable, author = {Gulia, Jyoti and Sharma, Prabhakar and Garg, Vibhuti}, title = {{Renewable Energy Tenders Issuance in India Not in Tandem With Government Targets}}, institution = {Institute for Energy Economics and Financial Analysis}, url = {https://ieefa.org/sites/default/files/2023-03/Renewable%20Energy%20Tenders%20Issuance%20in%20India%20not%20in%20tandem%20goverment%20targets-Feb2023.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document ieefa-001875} }

Full text

Collected · Record updated