Implementation of Market Coupling in India: Recommendations to the Central Electricity Regulatory Commission (CERC)

Report an error

Summary

AI-generated

This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.

Learn more about AI enrichment

This policy brief recommends that India implement market coupling through a phased approach led by a non-profit Market Coupling Operator to enhance liquidity and price signal accuracy in the wholesale spot market.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • India's current fragmented power market suffers from low liquidity (only 7%), multiple segments, and a low price cap, which leads to aggressive supply-side bidding despite unfulfilled demand.
  • The implementation of market coupling should be phased, starting with pilot projects involving power exchanges and Inter-State Generating Station (ISGS)/security-constrained economic dispatch (SCED) before expanding to a larger market share.
  • A non-profit Market Coupling Operator (MCO) should be selected to manage the process, with a focus on transparency, accountability, and the ability to eventually integrate day-ahead and ancillary services markets.
  • Current market signals in India are inaccurate, frequently hitting the maximum ceiling rate of Rs.10 per kilowatt-hour, which fails to attract sufficient entry to meet growing peak demand.

Cite the original document

APA
Institute for Energy Economics and Financial Analysis (n.d.). Implementation of Market Coupling in India: Recommendations to the Central Electricity Regulatory Commission (CERC). https://ieefa.org/sites/default/files/2023-11/Recommendations%20on%20market%20coupling.pdf
Chicago
Institute for Energy Economics and Financial Analysis. Implementation of Market Coupling in India: Recommendations to the Central Electricity Regulatory Commission (CERC). n.d. https://ieefa.org/sites/default/files/2023-11/Recommendations%20on%20market%20coupling.pdf.
Wikipedia
{{cite report |author=Institute for Energy Economics and Financial Analysis |title=Implementation of Market Coupling in India: Recommendations to the Central Electricity Regulatory Commission (CERC) |url=https://ieefa.org/sites/default/files/2023-11/Recommendations%20on%20market%20coupling.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document ieefa-001870)}}
BibTeX
@techreport{instituteforenergyeconomicsandfinancialanalysisndimplementation, author = {{Institute for Energy Economics and Financial Analysis}}, title = {{Implementation of Market Coupling in India: Recommendations to the Central Electricity Regulatory Commission (CERC)}}, institution = {Institute for Energy Economics and Financial Analysis}, url = {https://ieefa.org/sites/default/files/2023-11/Recommendations%20on%20market%20coupling.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document ieefa-001870} }

Full text

Collected · Record updated