Summary

AI-generated

This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.

Learn more about AI enrichment

The report finds that Indonesia's announced net zero plan for the power sector is largely a rebranding of existing decommissioning schedules rather than a new climate strategy, with significant coal capacity still planned for deployment.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • The announced net zero emission (NZE) plan does not represent a reset of Indonesia's carbon emissions pathway but instead highlights existing plans for the orderly decommissioning of antiquated coal facilities based on their economic age.
  • Approximately 16 GW of new coal capacity from the 35 GW program is still expected to come online between 2021 and 2030, including an estimated 4.1 GW to 4.3 GW of plants that were still in the 'Financing Stage' as of FY2020.
  • The first phase of coal plant retirements planned for 2030 involves 1 GW of very old plants (50-60 years old) that have been operating on oil or gas, meaning these retirements are not ambitious as the plants are already overdue for decommissioning.
  • There is a significant discrepancy between the NZE scenarios of PLN and MEMR regarding electricity growth projections and the energy mix; PLN projects a more modest growth (above 1,500 TWh) and emphasizes variable renewable energy after 2030, while MEMR projects higher growth (over 2,000 TWh) and relies more on biomass and gas with carbon capture.
  • PLN's financial health is obscured by an accounting exemption (POJK Regulation No 6/2017) that allows it to keep Power Purchase Agreements (PPAs) and Energy Sales Contracts (ESCs) off-balance sheet; if these were treated as finance leases under SFAS 73, PLN's net profit for 2020 would have dropped from IDR 5.9 trillion to IDR 990 billion.

Cite the original document

APA
Hamdi, E., & Adhiguna, P. (2021). Putting PLN’s Net Zero Ambition Into Context. Institute for Energy Economics and Financial Analysis. https://ieefa.org/wp-content/uploads/2021/06/Putting-PLNs-Net-Zero-Ambition-Into-Context_June-2021.pdf
Chicago
Hamdi, Elrika, and Putra Adhiguna. Putting PLN’s Net Zero Ambition Into Context. Institute for Energy Economics and Financial Analysis, 2021. https://ieefa.org/wp-content/uploads/2021/06/Putting-PLNs-Net-Zero-Ambition-Into-Context_June-2021.pdf.
Wikipedia
{{cite report |last1=Hamdi |first1=Elrika |last2=Adhiguna |first2=Putra |title=Putting PLN’s Net Zero Ambition Into Context |publisher=Institute for Energy Economics and Financial Analysis |date=June 2021 |url=https://ieefa.org/wp-content/uploads/2021/06/Putting-PLNs-Net-Zero-Ambition-Into-Context_June-2021.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document ieefa-001856)}}
BibTeX
@techreport{hamdi2021putting, author = {Hamdi, Elrika and Adhiguna, Putra}, title = {{Putting PLN’s Net Zero Ambition Into Context}}, institution = {Institute for Energy Economics and Financial Analysis}, year = {2021}, month = jun, url = {https://ieefa.org/wp-content/uploads/2021/06/Putting-PLNs-Net-Zero-Ambition-Into-Context_June-2021.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document ieefa-001856} }

Full text

Collected · Record updated