The report concludes that Enchant Energy's proposed CCS project at the San Juan Generating Station is a 'fantasy' that relies on unrealistic capacity factors and capture rates, posing significant financial risks to investors and the community.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • Enchant Energy's proposal relies on three unrealistic assumptions: that the retrofitted units will maintain an average capacity factor of at least 85% for 12 years, that the plant will capture 90% of CO2 for at least 85% of the hours annually, and that it can sell six million metric tons of CO2 per year for enhanced oil recovery (EOR) in the Permian Basin.
  • The 85% capacity factor assumption is contradicted by San Juan's history; the collective capacity factor for Units 1 and 4 averaged only 70% since January 2010 and dropped to 63% after Units 2 and 3 were retired at the end of 2017.
  • Market forces, including low-cost natural gas and the rapid growth of wind and solar generation in the Western U.S., are expected to further depress San Juan's capacity factor.
  • Existing commercial-scale CCS projects, Petra Nova in Texas and Boundary Dam 3 in Canada, have failed to consistently meet 90% CO2 capture rates, suggesting the much larger San Juan project is unlikely to do so.
  • The estimated construction cost of $1.295 billion provided by Sargent & Lundy is considered extremely optimistic, as the actual cost of the smaller Petra Nova facility was $1 billion, or $4,458 per kW, compared to San Juan's estimate of $1,417 per kW.
  • The project's timeline is deemed unrealistic, as it would require financing, design, and construction to be completed in less than four years, whereas the smaller Petra Nova project took six years.
  • San Juan is not a low-cost electricity supplier; projected costs of generating electricity at the plant are expected to be an average of $6 per MWh higher than market prices and more expensive than solar PPAs through 2035.
  • The project faces significant CO2 and oil market risks, as demand for EOR is declining in North America and oil price volatility makes the assumed $17.50 per metric ton sale price unreliable.
  • The proposed retrofit would provide no net environmental benefit because the CO2 captured for EOR leads to the production of additional oil, which emits CO2 when burned.

Cite the original document

APA
Schlissel, D., & Wamsted, D. (2020). Enchant’s Proposed CCS Project at the San Juan Generating Station: False Promises and Major Risks. Institute for Energy Economics and Financial Analysis. https://ieefa.org/sites/default/files/resources/Proposed-CCS-Project-at-San-Juan-Generating-Station_February-2020.pdf
Chicago
Schlissel, David, and Dennis Wamsted. Enchant’s Proposed CCS Project at the San Juan Generating Station: False Promises and Major Risks. Institute for Energy Economics and Financial Analysis, 2020. https://ieefa.org/sites/default/files/resources/Proposed-CCS-Project-at-San-Juan-Generating-Station_February-2020.pdf.
Wikipedia
{{cite report |last1=Schlissel |first1=David |last2=Wamsted |first2=Dennis |title=Enchant’s Proposed CCS Project at the San Juan Generating Station: False Promises and Major Risks |publisher=Institute for Energy Economics and Financial Analysis |date=February 2020 |url=https://ieefa.org/sites/default/files/resources/Proposed-CCS-Project-at-San-Juan-Generating-Station_February-2020.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document ieefa-001844)}}
BibTeX
@techreport{schlissel2020enchants, author = {Schlissel, David and Wamsted, Dennis}, title = {{Enchant’s Proposed CCS Project at the San Juan Generating Station: False Promises and Major Risks}}, institution = {Institute for Energy Economics and Financial Analysis}, year = {2020}, month = feb, url = {https://ieefa.org/sites/default/files/resources/Proposed-CCS-Project-at-San-Juan-Generating-Station_February-2020.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document ieefa-001844} }

Full text

Collected · Record updated