Philippines Moratorium on Greenfield Coal Projects Will Attract USD 30 Billion in Renewable Energy Investment

Report an error

Summary

AI-generated

This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.

Learn more about AI enrichment

The Philippines' Department of Energy has implemented a moratorium on new coal power plants, which IEEFA estimates could attract over USD 30 billion in renewable energy investment over the next decade.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • The Department of Energy (DOE) has called for a moratorium on greenfield coal power plants to prioritize flexible, lower-cost alternatives to thermal power baseload, addressing power market problems exacerbated by the pandemic and grid instability.
  • In May 2020, coal-fired power units were responsible for 60% of power outages, due to their inherent inflexibility and inability to operate below a minimum stable value.
  • Over 10 gigawatts (GW) of greenfield coal plants are affected by the moratorium, with 82.1% of this capacity planned for the Luzon grid and Meralco's distribution system.
  • IEEFA estimates that shifting the energy mix from coal (reducing its share from 41.5% to 16.0%) to solar and wind (increasing from 5.4% to 43.8%) could create an investment opportunity of over USD 30 billion over the next decade.
  • Major industry players like San Miguel and Meralco, despite having coal projects in their pipeline, are pivoting toward renewables; San Miguel is seeking to invest in 10GW of renewable energy and storage, while Meralco's generation subsidiary plans to deploy 1GW of renewable energy over the next 4 to 6 years.

Cite the original document

APA
Ahmed, S. J., & Brown, M. (2020). Philippines Moratorium on Greenfield Coal Projects Will Attract USD 30 Billion in Renewable Energy Investment. Institute for Energy Economics and Financial Analysis. https://ieefa.org/sites/default/files/2022-05/Philippines-Greenfield-Coal-Project-Moratorium-Will-Attract-Billions-in-RE-Investment_November-2020.pdf
Chicago
Ahmed, Sara Jane, and Melissa Brown. Philippines Moratorium on Greenfield Coal Projects Will Attract USD 30 Billion in Renewable Energy Investment. Institute for Energy Economics and Financial Analysis, 2020. https://ieefa.org/sites/default/files/2022-05/Philippines-Greenfield-Coal-Project-Moratorium-Will-Attract-Billions-in-RE-Investment_November-2020.pdf.
Wikipedia
{{cite report |last1=Ahmed |first1=Sara Jane |last2=Brown |first2=Melissa |title=Philippines Moratorium on Greenfield Coal Projects Will Attract USD 30 Billion in Renewable Energy Investment |publisher=Institute for Energy Economics and Financial Analysis |date=November 2020 |url=https://ieefa.org/sites/default/files/2022-05/Philippines-Greenfield-Coal-Project-Moratorium-Will-Attract-Billions-in-RE-Investment_November-2020.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document ieefa-001799)}}
BibTeX
@techreport{ahmed2020philippines, author = {Ahmed, Sara Jane and Brown, Melissa}, title = {{Philippines Moratorium on Greenfield Coal Projects Will Attract USD 30 Billion in Renewable Energy Investment}}, institution = {Institute for Energy Economics and Financial Analysis}, year = {2020}, month = nov, url = {https://ieefa.org/sites/default/files/2022-05/Philippines-Greenfield-Coal-Project-Moratorium-Will-Attract-Billions-in-RE-Investment_November-2020.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document ieefa-001799} }

Full text

Collected · Record updated