Philippines Moratorium on Greenfield Coal Projects Will Attract USD 30 Billion in Renewable Energy Investment
Summary
The Philippines' Department of Energy has implemented a moratorium on new coal power plants, which IEEFA estimates could attract over USD 30 billion in renewable energy investment over the next decade.
Key insights
- The Department of Energy (DOE) has called for a moratorium on greenfield coal power plants to prioritize flexible, lower-cost alternatives to thermal power baseload, addressing power market problems exacerbated by the pandemic and grid instability.
- In May 2020, coal-fired power units were responsible for 60% of power outages, due to their inherent inflexibility and inability to operate below a minimum stable value.
- Over 10 gigawatts (GW) of greenfield coal plants are affected by the moratorium, with 82.1% of this capacity planned for the Luzon grid and Meralco's distribution system.
- IEEFA estimates that shifting the energy mix from coal (reducing its share from 41.5% to 16.0%) to solar and wind (increasing from 5.4% to 43.8%) could create an investment opportunity of over USD 30 billion over the next decade.
- Major industry players like San Miguel and Meralco, despite having coal projects in their pipeline, are pivoting toward renewables; San Miguel is seeking to invest in 10GW of renewable energy and storage, while Meralco's generation subsidiary plans to deploy 1GW of renewable energy over the next 4 to 6 years.
Cite the original document
- APA
- Ahmed, S. J., & Brown, M. (2020). Philippines Moratorium on Greenfield Coal Projects Will Attract USD 30 Billion in Renewable Energy Investment. Institute for Energy Economics and Financial Analysis. https://ieefa.org/sites/default/files/2022-05/Philippines-Greenfield-Coal-Project-Moratorium-Will-Attract-Billions-in-RE-Investment_November-2020.pdf
- Chicago
- Ahmed, Sara Jane, and Melissa Brown. Philippines Moratorium on Greenfield Coal Projects Will Attract USD 30 Billion in Renewable Energy Investment. Institute for Energy Economics and Financial Analysis, 2020. https://ieefa.org/sites/default/files/2022-05/Philippines-Greenfield-Coal-Project-Moratorium-Will-Attract-Billions-in-RE-Investment_November-2020.pdf.
- Wikipedia
- {{cite report |last1=Ahmed |first1=Sara Jane |last2=Brown |first2=Melissa |title=Philippines Moratorium on Greenfield Coal Projects Will Attract USD 30 Billion in Renewable Energy Investment |publisher=Institute for Energy Economics and Financial Analysis |date=November 2020 |url=https://ieefa.org/sites/default/files/2022-05/Philippines-Greenfield-Coal-Project-Moratorium-Will-Attract-Billions-in-RE-Investment_November-2020.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document ieefa-001799)}}
- BibTeX
- @techreport{ahmed2020philippines, author = {Ahmed, Sara Jane and Brown, Melissa}, title = {{Philippines Moratorium on Greenfield Coal Projects Will Attract USD 30 Billion in Renewable Energy Investment}}, institution = {Institute for Energy Economics and Financial Analysis}, year = {2020}, month = nov, url = {https://ieefa.org/sites/default/files/2022-05/Philippines-Greenfield-Coal-Project-Moratorium-Will-Attract-Billions-in-RE-Investment_November-2020.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document ieefa-001799} }
Full text
Collected · Record updated