No Economic Case for New Lignite Plant in Bosnia and Herzegovina
Summary
This IEEFA report concludes there is no economic case for the proposed Gacko II lignite plant in Bosnia and Herzegovina, as carbon pricing and high capital costs would likely make it a stranded asset.
Key insights
- The proposed Gacko II lignite-fired power plant is economically non-viable across all modelled scenarios, including those with optimistic technical specifications and delayed carbon pricing, resulting in a negative net present value (NPV).
- Carbon pricing, specifically through the European Union Carbon Border Adjustment Mechanism (CBAM), poses a critical risk that could make Gacko II cash-flow negative as early as 2026, potentially before the plant becomes operational.
- A renewable energy portfolio consisting of 115 MW of solar and 115 MW of wind would cost approximately €264 million—about half the cost of Gacko II—while offering safer returns and producing power roughly equal to 40% of Gacko I's 2021 output.
- Securing financing and insurance for new coal projects is increasingly difficult; China, previously a major financier, announced in September 2021 that it would no longer support new coal power plants overseas.
- The long-term evolution of power markets toward decarbonisation, decentralisation, and digitalisation will penalise inflexible baseload resources like Gacko II, as volatility and scarcity pricing will instead reward fast-response, low-variable-cost resources.
Cite the original document
- APA
- Coghe, P., & Flora, A. (2023). No Economic Case for New Lignite Plant in Bosnia and Herzegovina. Institute for Energy Economics and Financial Analysis. https://ieefa.org/sites/default/files/2023-03/No%20Economic%20Case%20for%20New%20Lignite%20Plant%20in%20Bosnia%20and%20Herzegovina_March%202023.pdf
- Chicago
- Coghe, Paolo, and Arjun Flora. No Economic Case for New Lignite Plant in Bosnia and Herzegovina. Institute for Energy Economics and Financial Analysis, 2023. https://ieefa.org/sites/default/files/2023-03/No%20Economic%20Case%20for%20New%20Lignite%20Plant%20in%20Bosnia%20and%20Herzegovina_March%202023.pdf.
- Wikipedia
- {{cite report |last1=Coghe |first1=Paolo |last2=Flora |first2=Arjun |title=No Economic Case for New Lignite Plant in Bosnia and Herzegovina |publisher=Institute for Energy Economics and Financial Analysis |date=March 2023 |url=https://ieefa.org/sites/default/files/2023-03/No%20Economic%20Case%20for%20New%20Lignite%20Plant%20in%20Bosnia%20and%20Herzegovina_March%202023.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document ieefa-001744)}}
- BibTeX
- @techreport{coghe2023economic, author = {Coghe, Paolo and Flora, Arjun}, title = {{No Economic Case for New Lignite Plant in Bosnia and Herzegovina}}, institution = {Institute for Energy Economics and Financial Analysis}, year = {2023}, month = mar, url = {https://ieefa.org/sites/default/files/2023-03/No%20Economic%20Case%20for%20New%20Lignite%20Plant%20in%20Bosnia%20and%20Herzegovina_March%202023.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document ieefa-001744} }