New Risk Factors Emerge as GE Shutters California Power Plant— 20 Years Early

Report an error

Summary

AI-generated

This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.

Learn more about AI enrichment

GE is closing its $1 billion Inland Empire Power Plant in California only 10 years into its 30-year life cycle because the facility's technology is obsolete and uneconomic compared to low-cost wind and solar energy.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • GE will close the Inland Empire Power Plant (IEEC) at the end of 2019, only 10 years into a planned 30-year life cycle, due to obsolete technology and unsustainably low revenues.
  • The plant's H-class turbines suffered from complexity, exceptionally long maintenance outages, and operational failures, including Unit Two being shut down at commissioning due to undisclosed damage.
  • The facility became uneconomical because its legacy turbines lacked the fast-start capabilities required to supplement solar and wind energy during peak demand, and California's air permit standards limited the feasibility of retrofits.
  • Renewable energy costs have plummeted, with wind and solar levelized costs of energy (LCOE) dropping by 88% and 69% respectively between 2009 and 2018, making gas baseload uncompetitive.
  • GE's broader strategy in natural gas has faced significant failures, including a $23 billion impairment charge in 2018 and a 60% year-on-year drop in large gas turbine unit sales from 102 in 2017 to 42 in 2018.
  • The newer HA-class turbines are also experiencing technical issues, with four turbines in Texas shut down for blade repairs in 2018 and reports of planned shutdowns for at least 18 of 55 shipped models globally.
  • The early closure of the Inland Empire plant represents an estimated $670 million loss, which is more significant given GE's reduced market capitalization of $82 billion.

Cite the original document

APA
Hipple, K., Sanzillo, T., & Buckley, T. (2019). New Risk Factors Emerge as GE Shutters California Power Plant— 20 Years Early. Institute for Energy Economics and Financial Analysis. https://ieefa.org/sites/default/files/resources/New-Risk-Factors-Emerge-as-GE-Shutters-California-Power-Plant_July-2019.pdf
Chicago
Hipple, Kathy, Tom Sanzillo, and Tim Buckley. New Risk Factors Emerge as GE Shutters California Power Plant— 20 Years Early. Institute for Energy Economics and Financial Analysis, 2019. https://ieefa.org/sites/default/files/resources/New-Risk-Factors-Emerge-as-GE-Shutters-California-Power-Plant_July-2019.pdf.
Wikipedia
{{cite report |last1=Hipple |first1=Kathy |last2=Sanzillo |first2=Tom |last3=Buckley |first3=Tim |title=New Risk Factors Emerge as GE Shutters California Power Plant— 20 Years Early |publisher=Institute for Energy Economics and Financial Analysis |date=July 2019 |url=https://ieefa.org/sites/default/files/resources/New-Risk-Factors-Emerge-as-GE-Shutters-California-Power-Plant_July-2019.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document ieefa-001742)}}
BibTeX
@techreport{hipple2019new, author = {Hipple, Kathy and Sanzillo, Tom and Buckley, Tim}, title = {{New Risk Factors Emerge as GE Shutters California Power Plant— 20 Years Early}}, institution = {Institute for Energy Economics and Financial Analysis}, year = {2019}, month = jul, url = {https://ieefa.org/sites/default/files/resources/New-Risk-Factors-Emerge-as-GE-Shutters-California-Power-Plant_July-2019.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document ieefa-001742} }

Full text

Collected · Record updated