The IEEFA concludes that repowering the Cayuga Power Plant is uneconomic and would require over $265 million in ratepayer subsidies by 2027 without providing a permanent solution to grid reliability.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • The repowered Cayuga plant would be uneconomic to operate without ongoing ratepayer subsidies; by the end of the 10-year repowering period in 2027, New York State Electric and Gas (NYSEG) customers would have paid more than $265 million to keep it operational.
  • Transmission upgrades recommended by NYSEG to address grid reliability concerns are required regardless of whether the Cayuga plant is repowered, nullifying the argument for subsidized repowering.
  • The plant is unlikely to be profitable between 2018 and 2027 without the proposed $9.6 million annual cash infusion from ratepayers, and it is very likely to be unprofitable after the 10-year term ends in 2027.
  • Claims that repowering would provide $17 million in production cost savings during gas price spikes are unsubstantiated and would benefit the plant owners rather than ratepayers, as energy sales revenues are assigned to the Cayuga Operating Company.
  • The fuel diversity benefits claimed by the owners are minor; for example, if Unit 1's output during January and February 2014 had been produced by gas-fired facilities, statewide natural gas consumption for all end-uses would have increased by only about 0.48 percent.
  • The plant's age and recent operational failures, including a fire in January 2015 that took Unit 1 offline for nearly seven months, create significant reliability risks for ratepayers.
  • Closing the plant would result in an immediate annual tax revenue loss of $1.8 million and the loss of approximately 70 jobs.
  • The IEEFA suggests that the $1.8 million annual tax loss could be mitigated by a state-financed set-aside of $5.5 million paid over five years, potentially funded by the New York Power Authority (NYPA) or through a recently passed bill providing up to $19 million for municipalities facing revenue losses from plant closings.

Cite the original document

APA
Schlissel, D., Sanzillo, T., & Kunkel, C. (n.d.). Losing Proposition_ Why the Proposal to Repower the Cayuga Plant Should Be Rejected_IEEFA_Aug 2015.pdf. Institute for Energy Economics and Financial Analysis. https://ieefa.org/sites/default/files/resources/Losing-Proposition_-Why-the-Proposal-to-Repower-the-Cayuga-Plant-Should-Be-Rejected_IEEFA_Aug-2015.pdf
Chicago
Schlissel, David, Tom Sanzillo, and Cathy Kunkel. Losing Proposition_ Why the Proposal to Repower the Cayuga Plant Should Be Rejected_IEEFA_Aug 2015.pdf. Institute for Energy Economics and Financial Analysis, n.d. https://ieefa.org/sites/default/files/resources/Losing-Proposition_-Why-the-Proposal-to-Repower-the-Cayuga-Plant-Should-Be-Rejected_IEEFA_Aug-2015.pdf.
Wikipedia
{{cite report |last1=Schlissel |first1=David |last2=Sanzillo |first2=Tom |last3=Kunkel |first3=Cathy |title=Losing Proposition_ Why the Proposal to Repower the Cayuga Plant Should Be Rejected_IEEFA_Aug 2015.pdf |publisher=Institute for Energy Economics and Financial Analysis |url=https://ieefa.org/sites/default/files/resources/Losing-Proposition_-Why-the-Proposal-to-Repower-the-Cayuga-Plant-Should-Be-Rejected_IEEFA_Aug-2015.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document ieefa-001706)}}
BibTeX
@techreport{schlisselndlosing, author = {Schlissel, David and Sanzillo, Tom and Kunkel, Cathy}, title = {{Losing Proposition\_ Why the Proposal to Repower the Cayuga Plant Should Be Rejected\_IEEFA\_Aug 2015.pdf}}, institution = {Institute for Energy Economics and Financial Analysis}, url = {https://ieefa.org/sites/default/files/resources/Losing-Proposition_-Why-the-Proposal-to-Repower-the-Cayuga-Plant-Should-Be-Rejected_IEEFA_Aug-2015.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document ieefa-001706} }

Full text

Collected · Record updated