The Institute for Energy Economics and Financial Analysis requests federal investigations into the Palo Seco power plant project in Puerto Rico, citing systemic corruption and fraud in the Puerto Rico Electric Power Authority's contracting processes.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • The Puerto Rico Electric Power Authority (PREPA) intends to fund the construction of a 300 MW natural gas-fired power plant in the San Juan metropolitan area using federal mitigation funds under Section 404 of the Robert T. Stafford Disaster Relief and Emergency Assistance Act and the Community Development Block Grant - Disaster Relief (CDBG-DR) program.
  • The integrity of PREPA's financial reporting is compromised because the managing partner of BDO, the firm contracted for $2.6 million to provide auditing and financial consulting services, was arrested on charges of wire fraud, conspiracy, and money laundering on July 9th.
  • Publicly released chat messages between Governor Ricardo Rosselló and his advisors suggest a 'pay-to-play' system where concession contracts for PREPA's transmission and distribution system were used to secure campaign contributions.

Cite the original document

APA
Sanzillo, T., & Kunkel, C. (2019). letters-to-inspectors-general-re-prepa-contracts-july-2019-7c4b83edbb96572a.pdf. Institute for Energy Economics and Financial Analysis. https://ieefa.org/wp-content/uploads/2019/07/LETTERS-TO-INSPECTORS-GENERAL-re-PREPA-contracts-July-2019.pdf
Chicago
Sanzillo, Tom, and Cathy Kunkel. letters-to-inspectors-general-re-prepa-contracts-july-2019-7c4b83edbb96572a.pdf. Institute for Energy Economics and Financial Analysis, 2019. https://ieefa.org/wp-content/uploads/2019/07/LETTERS-TO-INSPECTORS-GENERAL-re-PREPA-contracts-July-2019.pdf.
Wikipedia
{{cite press release |last1=Sanzillo |first1=Tom |last2=Kunkel |first2=Cathy |title=letters-to-inspectors-general-re-prepa-contracts-july-2019-7c4b83edbb96572a.pdf |publisher=Institute for Energy Economics and Financial Analysis |date=22 July 2019 |url=https://ieefa.org/wp-content/uploads/2019/07/LETTERS-TO-INSPECTORS-GENERAL-re-PREPA-contracts-July-2019.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document ieefa-001696)}}
BibTeX
@misc{sanzillo2019letterstoinspectorsgeneralreprepacontractsjuly20197c4b83edbb96572apdf, author = {Sanzillo, Tom and Kunkel, Cathy}, title = {{letters-to-inspectors-general-re-prepa-contracts-july-2019-7c4b83edbb96572a.pdf}}, publisher = {Institute for Energy Economics and Financial Analysis}, year = {2019}, month = jul, url = {https://ieefa.org/wp-content/uploads/2019/07/LETTERS-TO-INSPECTORS-GENERAL-re-PREPA-contracts-July-2019.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document ieefa-001696} }

Full text

Collected · Record updated