¿Está amañado el futuro energético de Puerto Rico?

Report an error

Summary

AI-generated

This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.

Learn more about AI enrichment

The report concludes that New Fortress Energy received an unfair advantage through undisclosed pre-RFP communications and strategic asset control, arguing that the contract reflects a broader pattern of mismanagement and lack of transparency in Puerto Rico's energy transformation.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • New Fortress Energy (NFE) received an unfair advantage in the procurement process due to repeated meetings with PREPA and its financial advisor, Filsinger Energy Partners (FEP), before the Request for Proposals (RFP) was issued.
  • PREPA failed to disclose to other bidders that NFE had already submitted an unsolicited proposal and held leases on strategically important dock properties in the Port of San Juan.
  • A conflict of interest existed as PREPA's external legal counsel, King & Spalding, also represented entities of Fortress Investment Group, the parent company of New Fortress Energy.
  • The Financial Oversight and Management Board (FOMB/JSAF) approved the project despite pricing being 30% to 40% higher than industry benchmarks.
  • There were significant discrepancies in estimated annual savings: PREPA estimated $150 million, NFE claimed $285 million, while the FOMB estimated only $36 million to $56 million.
  • PREPA violated its own internal protocols by failing to conduct a 'desirability and convenience study' after receiving NFE's unsolicited proposal and failing to notify bidders of the proposal's existence.
  • The energy transformation process in Puerto Rico is characterized by a fragmented, project-by-project approach that bypasses the Integrated Resource Plan (IRP) and lacks cost-benefit analysis.
  • The transformation process has heavily relied on expensive external consultants, with Filsinger Energy Partners billing $23 million between December 2017 and September 2019.

Cite the original document

APA
Sanzillo, T., & Vila-Biaggi, I. M. (2020). ¿Está amañado el futuro energético de Puerto Rico? Institute for Energy Economics and Financial Analysis. https://ieefa.org/wp-content/uploads/2020/06/Is-Puerto-Ricos-Energy-Future-Rigged_June-2020_ES.pdf
Chicago
Sanzillo, Tom, and Ingrid M. Vila-Biaggi. ¿Está amañado el futuro energético de Puerto Rico? Institute for Energy Economics and Financial Analysis, 2020. https://ieefa.org/wp-content/uploads/2020/06/Is-Puerto-Ricos-Energy-Future-Rigged_June-2020_ES.pdf.
Wikipedia
{{cite report |last1=Sanzillo |first1=Tom |last2=Vila-Biaggi |first2=Ingrid M. |title=¿Está amañado el futuro energético de Puerto Rico? |publisher=Institute for Energy Economics and Financial Analysis |date=June 2020 |url=https://ieefa.org/wp-content/uploads/2020/06/Is-Puerto-Ricos-Energy-Future-Rigged_June-2020_ES.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document ieefa-001664)}}
BibTeX
@techreport{sanzillo2020est, author = {Sanzillo, Tom and Vila-Biaggi, Ingrid M.}, title = {{¿Está amañado el futuro energético de Puerto Rico?}}, institution = {Institute for Energy Economics and Financial Analysis}, year = {2020}, month = jun, url = {https://ieefa.org/wp-content/uploads/2020/06/Is-Puerto-Ricos-Energy-Future-Rigged_June-2020_ES.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document ieefa-001664} }

Full text

Collected · Record updated