The report finds that Indonesia's solar sector is severely underdeveloped due to inconsistent policies, restrictive local content requirements, and a state utility biased toward coal, resulting in only 24 MW of installed on-grid solar capacity.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • Indonesia's solar policy framework has failed to deliver cost-effective renewables, with IEEFA estimating only 24 MW of solar, including rooftop units, are currently installed and dispatchable to the grid.
  • The state power company, Perusahaan Listrik Negara (PLN), exhibits a strong bias toward coal-fired power, which is reinforced by long-term thermal power PPAs and artificial caps on domestic coal prices, leading to a lack of interest in flexible technologies like solar.
  • Local content requirements have created a 'vicious cycle' where IPPs must use more expensive, lower-quality local panels while competing with subsidized coal costs, preventing local manufacturers from achieving the scale necessary to be competitive.
  • The Build Own Operate Transfer (BOOT) policy, which requires IPPs to transfer projects to PLN after the PPA expires, undermines project bankability by restricting economic life to 20 years and creating risks around land acquisition and valuation.
  • Ministerial Regulation No. 49/2018 on rooftop solar is designed to discourage residential users who export excess power to the grid by valuing exported electricity at only 65% of the PLN tariff and limiting credit carry-forward to three months.
  • Financing is not the primary barrier for utility-scale solar in Indonesia; rather, the lack of scalable projects of sufficient size (typically 25-50 MW) to meet the bankability standards of international banks and Development Finance Institutions is the main issue.
  • PLN's grid management is opaque and often used as a barrier to solar projects, with officials citing grid constraints or intermittency issues to halt projects, even when solar could reduce the need for high-cost night-time peakers.

Cite the original document

APA
Hamdi, E. (2019). Indonesia’s Solar Policies Designed to Fail? Institute for Energy Economics and Financial Analysis. https://ieefa.org/sites/default/files/resources/Indonesias-Solar-Policies_February-2019.pdf
Chicago
Hamdi, Elrika. Indonesia’s Solar Policies Designed to Fail? Institute for Energy Economics and Financial Analysis, 2019. https://ieefa.org/sites/default/files/resources/Indonesias-Solar-Policies_February-2019.pdf.
Wikipedia
{{cite report |last1=Hamdi |first1=Elrika |title=Indonesia’s Solar Policies Designed to Fail? |publisher=Institute for Energy Economics and Financial Analysis |date=February 2019 |url=https://ieefa.org/sites/default/files/resources/Indonesias-Solar-Policies_February-2019.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document ieefa-001654)}}
BibTeX
@techreport{hamdi2019indonesias, author = {Hamdi, Elrika}, title = {{Indonesia’s Solar Policies Designed to Fail?}}, institution = {Institute for Energy Economics and Financial Analysis}, year = {2019}, month = feb, url = {https://ieefa.org/sites/default/files/resources/Indonesias-Solar-Policies_February-2019.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document ieefa-001654} }

Full text

Collected · Record updated