Indonesia Wants to Go Greener, but PLN Is Stuck With Excess Capacity From Coal-Fired Power Plants
Summary
Indonesia's state utility PLN is trapped in a financial crisis caused by over-investment in coal-fired power plants, largely funded by Japan and China. The report finds that PLN's main grids are structurally over-supplied for the next decade, necessitating a coordinated reform process involving these foreign investors.
Key insights
- PLN's main grids, specifically Java-Bali and Sumatera, are structurally over-supplied for the next decade, with forecasted reserve margins of 40-60% for Java-Bali and 30-56% for Sumatera.
- Japanese and Chinese investors hold 41% of ownership interests in Indonesia's coal independent power producer (IPP) projects.
- Of the 31.9 GW of installed coal-fired power plant (CFPP) capacity, 41% (12.9 GW) was financed by Chinese entities and 17% (5.5 GW) by Japanese banks.
- PLN's overcapacity was driven by over-optimistic power demand forecasts, which were overestimated by an average of 34.2% over an eight-year period following the 2015 RUPTL.
- The financial crisis at PLN is exacerbated by rigid power purchase agreements (PPAs) with take-or-pay clauses and government guarantees, making it legally difficult to avoid coal lock-in.
Cite the original document
- APA
- Hamdi, E., & Adhiguna, P. (2021). Indonesia Wants to Go Greener, but PLN Is Stuck With Excess Capacity From Coal-Fired Power Plants. Institute for Energy Economics and Financial Analysis. https://ieefa.org/sites/default/files/resources/Indonesia-Wants-to-Go-Greener-but-PLN-Is-Stuck-With-Excess-Capacity_November-2021.pdf
- Chicago
- Hamdi, Elrika, and Putra Adhiguna. Indonesia Wants to Go Greener, but PLN Is Stuck With Excess Capacity From Coal-Fired Power Plants. Institute for Energy Economics and Financial Analysis, 2021. https://ieefa.org/sites/default/files/resources/Indonesia-Wants-to-Go-Greener-but-PLN-Is-Stuck-With-Excess-Capacity_November-2021.pdf.
- Wikipedia
- {{cite report |last1=Hamdi |first1=Elrika |last2=Adhiguna |first2=Putra |title=Indonesia Wants to Go Greener, but PLN Is Stuck With Excess Capacity From Coal-Fired Power Plants |publisher=Institute for Energy Economics and Financial Analysis |date=November 2021 |url=https://ieefa.org/sites/default/files/resources/Indonesia-Wants-to-Go-Greener-but-PLN-Is-Stuck-With-Excess-Capacity_November-2021.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document ieefa-001644)}}
- BibTeX
- @techreport{hamdi2021indonesia, author = {Hamdi, Elrika and Adhiguna, Putra}, title = {{Indonesia Wants to Go Greener, but PLN Is Stuck With Excess Capacity From Coal-Fired Power Plants}}, institution = {Institute for Energy Economics and Financial Analysis}, year = {2021}, month = nov, url = {https://ieefa.org/sites/default/files/resources/Indonesia-Wants-to-Go-Greener-but-PLN-Is-Stuck-With-Excess-Capacity_November-2021.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document ieefa-001644} }
Full text
Collected · Record updated