India’s Renewable Energy Policy Headwinds
Summary
The report identifies several policy headwinds, including counterproductive trade duties and poor grid expansion, that have slowed India's renewable energy growth. It estimates that US$500-700bn of new investment is required to meet the country's long-term renewable energy targets.
Key insights
- India's renewable energy capacity additions have fallen below targets; while 13GW was added annually in FY2016/17 and FY2017/18, additions dropped to less than 10GW in FY2018/19 and were expected to be 12-13GW in FY2019/20.
- The 25% trade duty on imported solar cells and modules from China and Malaysia, introduced in July 2018, has been counterproductive, increasing capital costs and required tariffs by 10-15% without significantly improving domestic manufacturing competitiveness.
- Poor coordination between central and state governments, particularly regarding land acquisition and grid connectivity in states like Gujarat, has led to project delays, cost overruns, and a 10-15% increase in wind tariffs.
- State-owned power distribution companies (discoms) are in severe financial distress, with overdue payments to power producers totaling Rs81,894 crore (~US$11.5bn) as of December 2019, including Rs5,936 crore (US$850m) owed to renewable energy producers.
- Transmission network expansion has slowed significantly, with only 10,625 ckt of new capacity expected for FY2019/20, creating a negative spiral where insufficient grid capacity further slows renewable energy deployment.
- Aggressive tariff caps in auctions and attempts by some states, such as Andhra Pradesh, to retrospectively renegotiate legally binding contracts have increased sovereign risk and deterred private investment.
- Financial constraints are tightening for renewable energy developers due to sovereign risk, erratic discom payments, and the ripple effect of non-performing assets (NPAs) in the thermal power sector, which are estimated at US$40-60bn.
- To achieve targets of 275GW by 2026/27 and 450GW by 2029/30, IEEFA estimates that US$500-700bn of new investment is required for renewable energy and grid modernization.
Cite the original document
- APA
- Buckley, T., & Shah, K. (2020). India’s Renewable Energy Policy Headwinds. Institute for Energy Economics and Financial Analysis. https://ieefa.org/sites/default/files/resources/Indias-Renewable-Energy-Policy-Headwinds_February-2020.pdf
- Chicago
- Buckley, Tim, and Kashish Shah. India’s Renewable Energy Policy Headwinds. Institute for Energy Economics and Financial Analysis, 2020. https://ieefa.org/sites/default/files/resources/Indias-Renewable-Energy-Policy-Headwinds_February-2020.pdf.
- Wikipedia
- {{cite report |last1=Buckley |first1=Tim |last2=Shah |first2=Kashish |title=India’s Renewable Energy Policy Headwinds |publisher=Institute for Energy Economics and Financial Analysis |date=February 2020 |url=https://ieefa.org/sites/default/files/resources/Indias-Renewable-Energy-Policy-Headwinds_February-2020.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document ieefa-001639)}}
- BibTeX
- @techreport{buckley2020indias, author = {Buckley, Tim and Shah, Kashish}, title = {{India’s Renewable Energy Policy Headwinds}}, institution = {Institute for Energy Economics and Financial Analysis}, year = {2020}, month = feb, url = {https://ieefa.org/sites/default/files/resources/Indias-Renewable-Energy-Policy-Headwinds_February-2020.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document ieefa-001639} }
Full text
Collected · Record updated