Summary
The report concludes that India's Ultra Mega Power Projects are financially unviable and unnecessary, recommending their suspension in favor of renewable energy and grid efficiency improvements.
Key insights
- India has sufficient electricity generation capacity to meet its needs for the next 5-6 years, rendering new greenfield coal-fired plants, particularly UMPPs, unnecessary.
- The UMPP program has seen very limited success; of the first four allocated projects, two have been abandoned and the two operational ones face cost overruns, litigation, and coal-supply issues.
- Capital costs for UMPPs increased by approximately 35% between 2013/14 and 2015/16, rising from Rs 20,000cr to Rs 27,000cr, which increases the risk of these projects becoming stranded assets.
- The Indian banking sector is under significant stress with Gross Non-Performing Advances (GNPAs) rising to 7.6% in March 2016, with the power sector being a root cause of these NPAs.
- Solar power has become significantly more competitive than coal, with tariffs in India dropping by 65% since 2010 to approximately Rs 4.4/kWh.
- The proposed Cheyyur UMPP in Tamil Nadu is particularly unviable due to pending litigation, land-acquisition delays, and the fact that Tamil Nadu's peak power shortage declined by 98% between May 2015 and May 2016.
- The Indian government has doubled coal taxes three times in the past four years, increasing the tax to Rs 400/t by 2016/17, which increases the cost and risk for coal-fired power plants.
Cite the original document
- APA
- Sharda, J., & Buckley, T. (n.d.). indias-questionable-ultra-mega-power-plans-viability-issues-continue-to-complicate-new-coal-fired-projects-august-2016-17f62d97eb03892a.pdf. Institute for Energy Economics and Financial Analysis. https://ieefa.org/sites/default/files/resources/Indias-Questionable-Ultra-Mega-Power-Plans-Viability-Issues-Continue-to-Complicate-New-Coal-Fired-Projects-August-2016.pdf
- Chicago
- Sharda, Jai, and Tim Buckley. indias-questionable-ultra-mega-power-plans-viability-issues-continue-to-complicate-new-coal-fired-projects-august-2016-17f62d97eb03892a.pdf. Institute for Energy Economics and Financial Analysis, n.d. https://ieefa.org/sites/default/files/resources/Indias-Questionable-Ultra-Mega-Power-Plans-Viability-Issues-Continue-to-Complicate-New-Coal-Fired-Projects-August-2016.pdf.
- Wikipedia
- {{cite report |last1=Sharda |first1=Jai |last2=Buckley |first2=Tim |title=indias-questionable-ultra-mega-power-plans-viability-issues-continue-to-complicate-new-coal-fired-projects-august-2016-17f62d97eb03892a.pdf |publisher=Institute for Energy Economics and Financial Analysis |url=https://ieefa.org/sites/default/files/resources/Indias-Questionable-Ultra-Mega-Power-Plans-Viability-Issues-Continue-to-Complicate-New-Coal-Fired-Projects-August-2016.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document ieefa-001638)}}
- BibTeX
- @techreport{shardandindiasquestionableultramegapowerplansviabilityissuescontinuetocomplicatenewcoalfiredprojectsaugust201617f62d97eb03892apdf, author = {Sharda, Jai and Buckley, Tim}, title = {{indias-questionable-ultra-mega-power-plans-viability-issues-continue-to-complicate-new-coal-fired-projects-august-2016-17f62d97eb03892a.pdf}}, institution = {Institute for Energy Economics and Financial Analysis}, url = {https://ieefa.org/sites/default/files/resources/Indias-Questionable-Ultra-Mega-Power-Plans-Viability-Issues-Continue-to-Complicate-New-Coal-Fired-Projects-August-2016.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document ieefa-001638} }
Full text
Collected · Record updated