This research paper identifies that nearly 19GW of renewable energy capacity in India is stalled due to discoms' reluctance to sign Power Sale Agreements, primarily driven by expectations of further falling solar tariffs and systemic financial distress within the distribution sector.
Key insights
- Approximately 18.97GW of renewable energy project capacity tendered by the Solar Energy Corporation of India (SECI) is currently on hold because Power Sale Agreements (PSAs) have not been executed. Manufacturing-linked solar projects represent the largest share of this stalled capacity at 63%.
- The delay in signing PSAs negatively impacts the value chain by dampening investor confidence, increasing business uncertainty for developers, and threatening project viability due to currency depreciation and module price fluctuations.
- Distribution companies (discoms) are reluctant to sign PSAs because they anticipate further declines in solar module prices and subsequent reductions in future auction tariffs. Solar tariffs in India fell by 75% over the seven years preceding the report.
- Systemic operational inefficiencies in the distribution sector, including electricity theft, poor billing, and heavy cross-subsidisation, have led to severe financial distress. As of Q2 FY2021, average Aggregate Technical and Commercial (AT&C) losses for most states were 24.31%, and combined overdue payments to generation companies reached Rs1256 billion by January 2021.
- Proposed solutions to encourage PSA signing include implementing stricter penalties for non-compliance with Renewable Purchase Obligations (RPOs) via the draft Electricity Act (Amendment) Bill 2020, using tariff pooling, and establishing a Central Enforcement Authority to ensure the sanctity of contracts.
- The imposition of a 40% basic customs duty (BCD) on imported solar modules and 25% on imported solar cells from April 1, 2022, is expected to increase solar tariffs by 45-50 paisa/kWh in the near term.
Cite the original document
- APA
- Gulia, J., Garg, V., & Thayillam, A. K. (2021). Indias Power Sale Agreement (PSA) Hold-Up: Fixing a Renewable Energy Bottleneck. Institute for Energy Economics and Financial Analysis. https://ieefa.org/sites/default/files/2022-05/Indias-Power-Sale-Agreement-Hold-Up-Fixing-a-Renewable-Energy-Bottleneck_April-2021%20%283%29.pdf
- Chicago
- Gulia, Jyoti, Vibhuti Garg, and Akhil Koshy Thayillam. Indias Power Sale Agreement (PSA) Hold-Up: Fixing a Renewable Energy Bottleneck. Institute for Energy Economics and Financial Analysis, 2021. https://ieefa.org/sites/default/files/2022-05/Indias-Power-Sale-Agreement-Hold-Up-Fixing-a-Renewable-Energy-Bottleneck_April-2021%20%283%29.pdf.
- Wikipedia
- {{cite report |last1=Gulia |first1=Jyoti |last2=Garg |first2=Vibhuti |last3=Thayillam |first3=Akhil Koshy |title=Indias Power Sale Agreement (PSA) Hold-Up: Fixing a Renewable Energy Bottleneck |publisher=Institute for Energy Economics and Financial Analysis |date=March 2021 |url=https://ieefa.org/sites/default/files/2022-05/Indias-Power-Sale-Agreement-Hold-Up-Fixing-a-Renewable-Energy-Bottleneck_April-2021%20%283%29.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document ieefa-001637)}}
- BibTeX
- @techreport{gulia2021indias, author = {Gulia, Jyoti and Garg, Vibhuti and Thayillam, Akhil Koshy}, title = {{Indias Power Sale Agreement (PSA) Hold-Up: Fixing a Renewable Energy Bottleneck}}, institution = {Institute for Energy Economics and Financial Analysis}, year = {2021}, month = mar, url = {https://ieefa.org/sites/default/files/2022-05/Indias-Power-Sale-Agreement-Hold-Up-Fixing-a-Renewable-Energy-Bottleneck_April-2021%20%283%29.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document ieefa-001637} }
Full text
Collected · Record updated