The report finds that India is approaching peak thermal coal demand due to the increasing cost-competitiveness of solar and wind power and significant energy efficiency improvements.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • In 2016/17, India reached a tipping point where new renewable energy installations (15.7 GW) first exceeded net thermal power additions (7.7 GW).
  • Solar and wind power costs in India fell by approximately 50% in two years, with tariffs reaching around US$0.038 per kilowatt-hour, making them cheaper than existing domestic thermal power generation.
  • IEEFA forecasts that net thermal power capacity additions will contract to below 5 GW annually over the next decade, driven by the retirement of inefficient, end-of-life subcritical coal plants.
  • India's thermal coal imports peaked in 2014/15 and are projected to drop by two-thirds over the following decade as domestic production increases and renewable energy displaces coal.
  • Energy efficiency measures, such as the mass adoption of LEDs which reduced peak demand by over 6 GW, are identified as one of the lowest-cost sources of electricity capacity.
  • The Ujjwal DISCOM Assurance Yojana (UDAY) scheme has improved the financial performance of distribution companies, with the gap between average cost of supply and average revenue realised halving from Rs0.58/kWh in 2015 to Rs0.26/kWh by October 2017.
  • India's thermal power sector faces significant stranded asset risks, with over 50 projects stranded and the sector representing approximately 12% of the US$150bn total bad debt in the Indian banking system.
  • The report argues that nuclear power is not a commercially viable option for India due to long lead times and cost overruns, noting that the government has halved its planned expansion to 7 GW.
  • India's draft third National Electricity Plan (NEP3) concludes that no new coal-fired power stations are required beyond those already under construction until at least 2027.
  • Water scarcity is increasingly impacting the viability of coal plants, exemplified by Adani Power's temporary shutdown of 2.6 GW of capacity in 2016 due to water shortages.

Cite the original document

APA
Buckley, T., & Shah, K. (2017). India’s Electricity Sector Transformation. Institute for Energy Economics and Financial Analysis. https://ieefa.org/sites/default/files/resources/India-Electricity-Sector-Transformation_Nov-2017-3.pdf
Chicago
Buckley, Tim, and Kashish Shah. India’s Electricity Sector Transformation. Institute for Energy Economics and Financial Analysis, 2017. https://ieefa.org/sites/default/files/resources/India-Electricity-Sector-Transformation_Nov-2017-3.pdf.
Wikipedia
{{cite report |last1=Buckley |first1=Tim |last2=Shah |first2=Kashish |title=India’s Electricity Sector Transformation |publisher=Institute for Energy Economics and Financial Analysis |date=21 November 2017 |url=https://ieefa.org/sites/default/files/resources/India-Electricity-Sector-Transformation_Nov-2017-3.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document ieefa-001620)}}
BibTeX
@techreport{buckley2017indias, author = {Buckley, Tim and Shah, Kashish}, title = {{India’s Electricity Sector Transformation}}, institution = {Institute for Energy Economics and Financial Analysis}, year = {2017}, month = nov, url = {https://ieefa.org/sites/default/files/resources/India-Electricity-Sector-Transformation_Nov-2017-3.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document ieefa-001620} }