India’s Photovoltaic Manufacturing Capacity Set to Surge

Report an error

Summary

AI-generated

This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.

Learn more about AI enrichment

India's solar PV module manufacturing nameplate capacity is projected to reach 110 GW by 2026, enabling the country to achieve self-sufficiency in module demand.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • India's solar PV module manufacturing nameplate capacity is expected to reach 110 GW by the financial year 2026, which would make the country self-sufficient for its solar PV module demand.
  • The cumulative nameplate capacity for solar modules in India more than doubled in one year, rising from 18 GW in March 2022 to 38 GW in March 2023.
  • The two tranches of the production-linked incentive (PLI) scheme are projected to add 51.6 GW of module capacity and at least 27.4 GW of integrated 'polysilicon-to-module' capacity within the next three to four years.
  • Indian PV exports by value increased by more than five times in FY2023 compared to FY2022, with the United States accounting for 93% of these exports between April and November 2022.
  • The Approved List of Models and Manufacturers (ALMM) serves as a critical trade barrier that protects domestic manufacturers by restricting the use of non-listed modules in government and certain open-access projects.
  • Despite capacity growth, India faces significant challenges including a lack of skilled manpower for installing and operating high-tech machinery and a continued reliance on imports for upstream components like polysilicon and wafers.
  • The Indian PV industry is transitioning toward advanced technologies, with approximately 90% of the market having moved to mono PERC technology, while newer technologies like TOPCon and HJT are beginning to gain prominence.
  • The cost of producing polysilicon in India is higher than in China due to higher initial capital expenditure and higher industrial electricity prices (US$100/MWh in India versus US$60–80/MWh in China).
  • The Indian government deferred the implementation of the ALMM until March 2024 to address a shortage of high-quality, high-wattage domestic modules that was causing a decline in solar installations.

Cite the original document

APA
Institute for Energy Economics and Financial Analysis (n.d.). India’s Photovoltaic Manufacturing Capacity Set to Surge. https://ieefa.org/sites/default/files/2023-04/India%27s%20Photovoltaic%20Manufacturing%20Capacity%20Set%20to%20Surge-April%202023%20%283%29.pdf
Chicago
Institute for Energy Economics and Financial Analysis. India’s Photovoltaic Manufacturing Capacity Set to Surge. n.d. https://ieefa.org/sites/default/files/2023-04/India%27s%20Photovoltaic%20Manufacturing%20Capacity%20Set%20to%20Surge-April%202023%20%283%29.pdf.
Wikipedia
{{cite report |author=Institute for Energy Economics and Financial Analysis |title=India’s Photovoltaic Manufacturing Capacity Set to Surge |url=https://ieefa.org/sites/default/files/2023-04/India%27s%20Photovoltaic%20Manufacturing%20Capacity%20Set%20to%20Surge-April%202023%20%283%29.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document ieefa-001609)}}
BibTeX
@techreport{instituteforenergyeconomicsandfinancialanalysisndindias, author = {{Institute for Energy Economics and Financial Analysis}}, title = {{India’s Photovoltaic Manufacturing Capacity Set to Surge}}, institution = {Institute for Energy Economics and Financial Analysis}, url = {https://ieefa.org/sites/default/files/2023-04/India%27s%20Photovoltaic%20Manufacturing%20Capacity%20Set%20to%20Surge-April%202023%20%283%29.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document ieefa-001609} }

Full text

Collected · Record updated