Expanded Capacity Investment Scheme (CIS) – Design Paper

Report an error

Summary

AI-generated

This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.

Learn more about AI enrichment

IEEFA argues that the Capacity Investment Scheme (CIS) needs additional renewable capacity beyond the planned 23GW and better alignment with coal exit dates to effectively reach Australia's 82% renewables target by 2030.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • There is a gap of approximately 13GW in renewable capacity support; while the CIS will underwrite 23GW, IEEFA and ITP Renewables modelling suggests about 36GW of large-scale wind and solar are needed to reach the 82% renewables target by 2030.
  • Uncertainty regarding the timing of coal-fired power station exits creates a risk for the CIS, as it makes revenue forecasts uncertain for investors and could increase the cost of underwriting for the government.
  • To avoid double-counting and ensure additional capacity, the 12GW of variable renewable energy committed by New South Wales should be additional to the federal government's 23GW, and NSW should potentially be excluded from the first auction until this is confirmed.
  • The government should implement a 'standing offer' for underwriting contracts after the first auction, providing a declared floor and ceiling price to allow smaller developers and projects (5MW and above) to access support without the uncertainty of a tender process.
  • To prevent 'ghost' projects from blocking viable candidates, the government should consider making planning approval a mandatory eligibility criterion for auctions beyond the first one.
  • The requirement for project operators to deliver Green Products (LGCs) to the federal government could hinder the ability of projects to sign power purchase agreements (PPAs), as offtakers typically want bundled electricity and green products.
  • The CIS should be designed to support solar-plus-battery hybrid projects, which may be easier and faster to deploy than wind projects due to planning approval delays, particularly in New South Wales.

Cite the original document

APA
Institute for Energy Economics and Financial Analysis (2024). Expanded Capacity Investment Scheme (CIS) – Design Paper. https://ieefa.org/sites/default/files/2024-04/IEEFA_Submission%20to%20CIS.pdf
Chicago
Institute for Energy Economics and Financial Analysis. Expanded Capacity Investment Scheme (CIS) – Design Paper. 2024. https://ieefa.org/sites/default/files/2024-04/IEEFA_Submission%20to%20CIS.pdf.
Wikipedia
{{cite press release |author=Institute for Energy Economics and Financial Analysis |title=Expanded Capacity Investment Scheme (CIS) – Design Paper |date=25 March 2024 |url=https://ieefa.org/sites/default/files/2024-04/IEEFA_Submission%20to%20CIS.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document ieefa-001577)}}
BibTeX
@misc{instituteforenergyeconomicsandfinancialanalysis2024expanded, author = {{Institute for Energy Economics and Financial Analysis}}, title = {{Expanded Capacity Investment Scheme (CIS) – Design Paper}}, publisher = {Institute for Energy Economics and Financial Analysis}, year = {2024}, month = mar, url = {https://ieefa.org/sites/default/files/2024-04/IEEFA_Submission%20to%20CIS.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document ieefa-001577} }

Full text

Collected · Record updated