Realizing Indonesia’s Ambitious Renewable Energy Goals Calls for a New Approach

Report an error

Summary

AI-generated

This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.

Learn more about AI enrichment

Indonesia needs a 'production line' approach to renewable energy procurement, utilizing solar parks and centralized contracting, to achieve its goal of adding 42.6 GW of renewable energy by 2034.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • Indonesia's Electricity Supply Business Plan (RUPTL) for 2025-2034 aims to add 42.6 GW of renewable energy by the end of 2034, contributing to a broader goal of 75 GW by 2040 under the Golden Indonesia Vision 2045.
  • To reach the 2040 target, Indonesia must increase its solar installation rate from nearly zero to approximately 5 GW annually for the next 15 years, which is equivalent to building 26 projects the size of the 192 MW Cirata floating solar project every year.
  • The current procurement model led by PT Perusahaan Listrik Negara (PLN), which relies on individual proposals and bespoke contractual terms, has caused significant delays and limited project realization.
  • A successful large-scale rollout requires a 'bulk development' model, such as solar parks, where the public sector identifies sites, secures land rights, and builds backbone transmission before auctioning blocks to private developers to reduce investor risk.
  • India's use of the solar park model since 2010 led to an 80% decrease in winning bid tariffs between 2013 and 2024, with solar costs becoming one-third lower than coal-generated electricity.
  • Saudi Arabia's rapid renewable expansion is attributed to the creation of the Renewable Energy Project Development Office (REPDO) for project preparation and the Saudi Power Purchasing Company (SPPC) as a financially credible central contracting counterparty.
  • Indonesia's Cirata project highlighted systemic hurdles, including three-year negotiation periods caused by strict local content requirements for solar PV panels and onerous demands on equity and profit sharing.
  • There is significant unfulfilled demand for renewables from the private sector, including over 130 RE100 members in Indonesia committed to 100% renewable energy by 2040, which could provide capacity without using public budgets.

Cite the original document

APA
Hauber, G. (2025). Realizing Indonesia’s Ambitious Renewable Energy Goals Calls for a New Approach. Institute for Energy Economics and Financial Analysis. https://ieefa.org/sites/default/files/2025-06/IEEFA_Realizing%20Indonesia%E2%80%99s%20Ambitious%20RE%20Goals%20Calls%20for%20a%20New%20Approach%20June2025.pdf
Chicago
Hauber, Grant. Realizing Indonesia’s Ambitious Renewable Energy Goals Calls for a New Approach. Institute for Energy Economics and Financial Analysis, 2025. https://ieefa.org/sites/default/files/2025-06/IEEFA_Realizing%20Indonesia%E2%80%99s%20Ambitious%20RE%20Goals%20Calls%20for%20a%20New%20Approach%20June2025.pdf.
Wikipedia
{{cite report |last1=Hauber |first1=Grant |title=Realizing Indonesia’s Ambitious Renewable Energy Goals Calls for a New Approach |publisher=Institute for Energy Economics and Financial Analysis |date=June 2025 |url=https://ieefa.org/sites/default/files/2025-06/IEEFA_Realizing%20Indonesia%E2%80%99s%20Ambitious%20RE%20Goals%20Calls%20for%20a%20New%20Approach%20June2025.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document ieefa-001571)}}
BibTeX
@techreport{hauber2025realizing, author = {Hauber, Grant}, title = {{Realizing Indonesia’s Ambitious Renewable Energy Goals Calls for a New Approach}}, institution = {Institute for Energy Economics and Financial Analysis}, year = {2025}, month = jun, url = {https://ieefa.org/sites/default/files/2025-06/IEEFA_Realizing%20Indonesia%E2%80%99s%20Ambitious%20RE%20Goals%20Calls%20for%20a%20New%20Approach%20June2025.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document ieefa-001571} }

Full text

Collected · Record updated