Indonesia Wants to Go Greener, but PLN Is Stuck With Excess Capacity From Coal-Fired Power Plants
Summary
Indonesia's power sector is burdened by excess coal-fired capacity, with Japanese and Chinese investors holding a combined 41% ownership interest in coal Independent Power Producer (IPP) projects. The report calls for these investors and the Indonesian government to support a transition to renewables to resolve PLN's financial and operational crisis.
Key insights
- PLN is experiencing a supply-demand imbalance and excess capacity that was highlighted as early as 2017, a situation that was further worsened by the COVID-19 pandemic.
- Japanese and Chinese investors have a dominant role in Indonesia's coal sector, collectively holding a 41% ownership interest in coal Independent Power Producer (IPP) projects.
- The build-out of coal capacity was driven by overly optimistic demand growth forecasts, government financial guarantees, strict take-or-pay agreements, and exemptions in PLN accounting rules.
- Public financiers and export credit agencies from Japan and China were essential in ensuring that many coal-fired power projects reached completion.
- Despite current excess capacity, power demand is projected to grow from 253TWh in 2021 to 390TWh by 2030, presenting an opportunity for renewable energy capacity.
Cite the original document
- APA
- Adhiguna, P., & Hamdi, E. (n.d.). Indonesia Wants to Go Greener, but PLN Is Stuck With Excess Capacity From Coal-Fired Power Plants. Institute for Energy Economics and Financial Analysis. https://ieefa.org/wp-content/uploads/2021/11/IEEFA_ChinaJapan_LinkedinR02.pdf
- Chicago
- Adhiguna, Putra, and Elrika Hamdi. Indonesia Wants to Go Greener, but PLN Is Stuck With Excess Capacity From Coal-Fired Power Plants. Institute for Energy Economics and Financial Analysis, n.d. https://ieefa.org/wp-content/uploads/2021/11/IEEFA_ChinaJapan_LinkedinR02.pdf.
- Wikipedia
- {{cite report |last1=Adhiguna |first1=Putra |last2=Hamdi |first2=Elrika |title=Indonesia Wants to Go Greener, but PLN Is Stuck With Excess Capacity From Coal-Fired Power Plants |publisher=Institute for Energy Economics and Financial Analysis |url=https://ieefa.org/wp-content/uploads/2021/11/IEEFA_ChinaJapan_LinkedinR02.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document ieefa-001542)}}
- BibTeX
- @techreport{adhigunandindonesia, author = {Adhiguna, Putra and Hamdi, Elrika}, title = {{Indonesia Wants to Go Greener, but PLN Is Stuck With Excess Capacity From Coal-Fired Power Plants}}, institution = {Institute for Energy Economics and Financial Analysis}, url = {https://ieefa.org/wp-content/uploads/2021/11/IEEFA_ChinaJapan_LinkedinR02.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document ieefa-001542} }
Full text
Collected · Record updated