ieefa-memo-on-peabody-bankruptcy-70bc23078b464342.pdf

Report an error

Summary

AI-generated

This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.

Learn more about AI enrichment

The IEEFA argues that Peabody Energy's bankruptcy business plan is misleadingly optimistic regarding coal production and cost controls, creating a high risk that the company may face bankruptcy again.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • Peabody Energy's projection to increase annual coal production in the Powder River Basin from 100 million tons in 2016 to 131 million tons by 2021 contradicts US Energy Information Administration (EIA) estimates, which forecast total regional growth between 14 million and 36 million tons over that period.
  • The company's cost-control program is based on unrealistic oil price assumptions; Peabody projects WTI Crude Oil to reach $56/bbl by 2021, while the World Bank projects $68/bbl and the EIA projects upwards of $81.00/bbl.
  • Peabody's claim of 6.3 billion tons of proven and probable reserves is likely an overestimation because the business plan identifies no specific mine closings or economic adjustments to reserves despite declining revenues and retiring coal-fired power plants.
  • Peabody has negotiated an agreement with state regulators to pay only 17.5% of its previously established reclamation liabilities, which IEEFA suggests may violate the intent of the self-bonding program and could be subject to new OSMRE rule-making.
  • The company's financial situation mirrors the failure of Patriot Coal, a 2007 Peabody spinoff that filed for bankruptcy in 2012 and 2015 due to a failure to align expenses and liabilities with weak revenue potential in Appalachia.

Cite the original document

APA
Institute for Energy Economics and Financial Analysis (n.d.). ieefa-memo-on-peabody-bankruptcy-70bc23078b464342.pdf. https://ieefa.org/wp-content/uploads/2016/09/IEEFA-memo-on-Peabody-Bankruptcy.pdf
Chicago
Institute for Energy Economics and Financial Analysis. ieefa-memo-on-peabody-bankruptcy-70bc23078b464342.pdf. n.d. https://ieefa.org/wp-content/uploads/2016/09/IEEFA-memo-on-Peabody-Bankruptcy.pdf.
Wikipedia
{{cite report |author=Institute for Energy Economics and Financial Analysis |title=ieefa-memo-on-peabody-bankruptcy-70bc23078b464342.pdf |url=https://ieefa.org/wp-content/uploads/2016/09/IEEFA-memo-on-Peabody-Bankruptcy.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document ieefa-001518)}}
BibTeX
@techreport{instituteforenergyeconomicsandfinancialanalysisndieefamemoonpeabodybankruptcy70bc23078b464342pdf, author = {{Institute for Energy Economics and Financial Analysis}}, title = {{ieefa-memo-on-peabody-bankruptcy-70bc23078b464342.pdf}}, institution = {Institute for Energy Economics and Financial Analysis}, url = {https://ieefa.org/wp-content/uploads/2016/09/IEEFA-memo-on-Peabody-Bankruptcy.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document ieefa-001518} }

Full text

Collected · Record updated