The Wiggins Island Coal Export Terminal (WICET) in Queensland is facing significant financial risk due to construction costs reaching A$3.27bn and expected utilisation rates of only 40-60% between 2015 and 2017.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • The total cost of the Wiggins Island Coal Export Terminal (WICET) is expected to reach A$3.27bn by full commissioning in 2015, up from an initial announcement of A$2.5bn, due in part to competition for construction resources with LNG projects at Curtis Island.
  • When combined with Aurizon's A$867m Wiggins Island Rail Project (WIRP), the total infrastructure cost for the rail and port is A$4.2bn, resulting in a cost of A$121 per tonne of export capacity, which is nearly three times the A$44 per tonne cost of the Adani Group's Abbot Point T1.
  • WICET is expected to operate at only 40-60% capacity between 2015 and 2017 because the coal mining companies that own the terminal have struggled to secure funding for the mines intended to feed the port.
  • The eight coal mining companies owning WICET are subject to take-or-pay contracts, which create material contingent liabilities for the miners and increase the risk of significant loan write-downs for the lending banks if these contracts are not enforced.
  • The financial difficulties and low utilisation of WICET, combined with the fact that Abbot Point was operating at only 44% as of March 2014, challenge the financial justification for further coal terminal expansions at Abbot Point and planned Stage II and III expansions at WICET.
  • WICET's funding includes A$3.0bn in syndicated debt facilities arranged by ANZ Banking Group, including a A$2.4bn non-recourse construction loan.

Cite the original document

APA
Institute for Energy Economics and Financial Analysis (2014). IEEFA Briefing Note - WICET. https://ieefa.org/sites/default/files/resources/IEEFA-Briefing-Note_WICET_May-2014.pdf
Chicago
Institute for Energy Economics and Financial Analysis. IEEFA Briefing Note - WICET. 2014. https://ieefa.org/sites/default/files/resources/IEEFA-Briefing-Note_WICET_May-2014.pdf.
Wikipedia
{{cite report |author=Institute for Energy Economics and Financial Analysis |title=IEEFA Briefing Note - WICET |date=May 2014 |url=https://ieefa.org/sites/default/files/resources/IEEFA-Briefing-Note_WICET_May-2014.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document ieefa-001486)}}
BibTeX
@techreport{instituteforenergyeconomicsandfinancialanalysis2014ieefa, author = {{Institute for Energy Economics and Financial Analysis}}, title = {{IEEFA Briefing Note - WICET}}, institution = {Institute for Energy Economics and Financial Analysis}, year = {2014}, month = may, url = {https://ieefa.org/sites/default/files/resources/IEEFA-Briefing-Note_WICET_May-2014.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document ieefa-001486} }

Full text

Collected · Record updated