IEEFA argues that the Middle Arm Industrial Precinct represents a substantial financial risk to taxpayers, particularly due to the unproven viability and liability issues associated with carbon capture and storage (CCS).
Key insights
- IEEFA asserts that the Middle Arm Industrial Precinct poses a substantial financial risk to taxpayers, specifically regarding the potential for taxpayers to inherit long-term liability for carbon capture and storage (CCS) infrastructure failures or remediation, as seen with the Gorgon facility in Western Australia where liability typically transfers to taxpayers after 15 years.
- The document challenges the effectiveness of CCS for the project, noting that global CCS projects typically focus on Scope 1 and 2 emissions and have never included Scope 3 emissions, which constitute the majority of gas production and use emissions. Furthermore, only three of 40 global CCS projects have achieved capture rates over 80%, and none have exceeded 90% of their targets.
- There is a discrepancy in Tamboran Resources' reported drilling plans, with a current environmental management plan for the Shenandoah South pilot project citing six wells in 18 months, while the company has separately indicated it may drill up to 200 wells in the Beetaloo basin.
Cite the original document
- APA
- Runciman, J. (2024). Hearing on Middle Arm Supplementary Submission from IEEFA. Institute for Energy Economics and Financial Analysis. https://ieefa.org/sites/default/files/2024-08/IEEFA%20supplementary%20submission%20-%20Senate%20%20inquiry%20on%20Middle%20Arm%20Industrial%20Precinct%20-%20Jul%202024.pdf
- Chicago
- Runciman, Joshua. Hearing on Middle Arm Supplementary Submission from IEEFA. Institute for Energy Economics and Financial Analysis, 2024. https://ieefa.org/sites/default/files/2024-08/IEEFA%20supplementary%20submission%20-%20Senate%20%20inquiry%20on%20Middle%20Arm%20Industrial%20Precinct%20-%20Jul%202024.pdf.
- Wikipedia
- {{cite press release |last1=Runciman |first1=Joshua |title=Hearing on Middle Arm Supplementary Submission from IEEFA |publisher=Institute for Energy Economics and Financial Analysis |date=18 July 2024 |url=https://ieefa.org/sites/default/files/2024-08/IEEFA%20supplementary%20submission%20-%20Senate%20%20inquiry%20on%20Middle%20Arm%20Industrial%20Precinct%20-%20Jul%202024.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document ieefa-001477)}}
- BibTeX
- @misc{runciman2024hearing, author = {Runciman, Joshua}, title = {{Hearing on Middle Arm Supplementary Submission from IEEFA}}, publisher = {Institute for Energy Economics and Financial Analysis}, year = {2024}, month = jul, url = {https://ieefa.org/sites/default/files/2024-08/IEEFA%20supplementary%20submission%20-%20Senate%20%20inquiry%20on%20Middle%20Arm%20Industrial%20Precinct%20-%20Jul%202024.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document ieefa-001477} }
Full text
Collected · Record updated