IEEFA Submission to: AEMC Draft Rule Determination – National Electricity Amendment (Extension of the Application of the IRM to the RRO) Rule
Summary
IEEFA recommends reconsidering the draft rule to extend the IRM to the RRO, asserting there is insufficient evidence that consumers are willing to pay for the resulting high level of reliability.
Key insights
- The Reliability Panel's analysis indicates that the IRM level of 0.0006% expected unserved energy (USE) is significantly more stringent than what consumers are willing to pay for, making it unsuitable as a reliability standard for the National Electricity Market (NEM).
- Achieving the reliability level stipulated by the IRM is estimated to cost approximately $100 million per year.
- Extending the IRM could lead to expensive and unnecessary investments in electricity supply if the Australian Energy Market Operator's (AEMO) Electricity Statement of Opportunities (ESOO) reports requirements based on the stringent IRM rather than the standard reliability level.
- There is a lack of broad stakeholder support for the extension; of eight submissions on the draft recommendation, five did not support it, two supported it, and one was neutral.
- The extension contradicts the original intent of the Energy Security Board, which stated the IRM was an interim measure to address immediate concerns and was intended to cease in March 2025.
Cite the original document
- APA
- Bowyer, J. (2023). IEEFA Submission to: AEMC Draft Rule Determination – National Electricity Amendment (Extension of the Application of the IRM to the RRO) Rule. Institute for Energy Economics and Financial Analysis. https://ieefa.org/sites/default/files/2023-09/IEEFA%20Submission_Extension%20of%20the%20application%20of%20the%20IRM%20to%20the%20RRO.pdf
- Chicago
- Bowyer, Johanna. IEEFA Submission to: AEMC Draft Rule Determination – National Electricity Amendment (Extension of the Application of the IRM to the RRO) Rule. Institute for Energy Economics and Financial Analysis, 2023. https://ieefa.org/sites/default/files/2023-09/IEEFA%20Submission_Extension%20of%20the%20application%20of%20the%20IRM%20to%20the%20RRO.pdf.
- Wikipedia
- {{cite press release |last1=Bowyer |first1=Johanna |title=IEEFA Submission to: AEMC Draft Rule Determination – National Electricity Amendment (Extension of the Application of the IRM to the RRO) Rule |publisher=Institute for Energy Economics and Financial Analysis |date=24 August 2023 |url=https://ieefa.org/sites/default/files/2023-09/IEEFA%20Submission_Extension%20of%20the%20application%20of%20the%20IRM%20to%20the%20RRO.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document ieefa-001465)}}
- BibTeX
- @misc{bowyer2023ieefa, author = {Bowyer, Johanna}, title = {{IEEFA Submission to: AEMC Draft Rule Determination – National Electricity Amendment (Extension of the Application of the IRM to the RRO) Rule}}, publisher = {Institute for Energy Economics and Financial Analysis}, year = {2023}, month = aug, url = {https://ieefa.org/sites/default/files/2023-09/IEEFA%20Submission_Extension%20of%20the%20application%20of%20the%20IRM%20to%20the%20RRO.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document ieefa-001465} }
Full text
Collected · Record updated