AusNet Services Access Arrangement 2023-28 Variation proposal
Summary
IEEFA opposes AusNet Services' request for an additional $70 million in accelerated depreciation, arguing that the decline of gas demand in Victoria is a foreseeable trend and that stranded asset risks should remain with the network operator.
Key insights
- AusNet Services has requested an additional $70 million in accelerated depreciation for its 2023-28 access arrangement, adding to the $105 million previously approved by the Australian Energy Regulator (AER).
- The shift toward electrification in Victoria is not an unforeseen event, as the state's Gas Substitution Roadmap was released in July 2022 and AusNet had previously acknowledged the primacy of the electrification pathway.
- Accelerated depreciation is an inappropriate regulatory tool for managing the decline of gas networks because it reallocates stranded asset risk from the network businesses to the consumers.
- Gas distribution networks in aggregate have had sufficient opportunity to recover efficient costs, with IEEFA analysis showing they recovered $1.8 billion in supernormal profits between 2014 and 2022 due to actual demand exceeding forecasts.
- The AER should develop consistent guidelines for regulating declining gas distribution networks in coordination with federal and state governments, rather than addressing issues through piecemeal access arrangement variations.
Cite the original document
- APA
- Institute for Energy Economics and Financial Analysis (2024). AusNet Services Access Arrangement 2023-28 Variation proposal. https://ieefa.org/sites/default/files/2024-12/IEEFA%20submission_%20AusNet%20Access%20Arrangements%20Consultation_November%202024.pdf
- Chicago
- Institute for Energy Economics and Financial Analysis. AusNet Services Access Arrangement 2023-28 Variation proposal. 2024. https://ieefa.org/sites/default/files/2024-12/IEEFA%20submission_%20AusNet%20Access%20Arrangements%20Consultation_November%202024.pdf.
- Wikipedia
- {{cite press release |author=Institute for Energy Economics and Financial Analysis |title=AusNet Services Access Arrangement 2023-28 Variation proposal |date=29 November 2024 |url=https://ieefa.org/sites/default/files/2024-12/IEEFA%20submission_%20AusNet%20Access%20Arrangements%20Consultation_November%202024.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document ieefa-001454)}}
- BibTeX
- @misc{instituteforenergyeconomicsandfinancialanalysis2024ausnet, author = {{Institute for Energy Economics and Financial Analysis}}, title = {{AusNet Services Access Arrangement 2023-28 Variation proposal}}, publisher = {Institute for Energy Economics and Financial Analysis}, year = {2024}, month = nov, url = {https://ieefa.org/sites/default/files/2024-12/IEEFA%20submission_%20AusNet%20Access%20Arrangements%20Consultation_November%202024.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document ieefa-001454} }
Full text
Collected · Record updated