Community of Interest process for Eraring Power Station
Summary
IEEFA submits that the closure of the Eraring Power Station should be managed via the Energy Industry Jobs Plan to ensure worker support and that the Net Zero Economy Authority coordinates replacement capacity and demand-side energy efficiency measures.
Key insights
- The Energy Industry Jobs Plan (EIJP) framework should be applied to the Eraring Power Station closure to provide structured support, including retraining and redeployment, for all affected workers.
- Providing certainty regarding the Eraring closure date is necessary to assist workers in transitioning to new industries and to give investors confidence in low-emissions electricity replacement capacity.
- The Net Zero Economy Authority should coordinate with the NSW Government to ensure replacement generation and storage capacity—including wind, utility-scale solar PV, and commercial and industrial (C&I) solar and batteries in the Lake Macquarie area—is available before the closure.
- Implementing energy upgrade measures, such as efficient electric appliances, rooftop solar, and batteries, could reduce annual residential electricity demand in NSW by 5.8 terawatthours, representing a net 20% reduction.
- Improving the thermal efficiency of existing NSW housing stock through insulation, draught proofing, and window sealing would reduce electricity demand and create local installation and maintenance jobs.
Cite the original document
- APA
- Institute for Energy Economics and Financial Analysis (2025). Community of Interest process for Eraring Power Station. https://ieefa.org/sites/default/files/2025-07/IEEFA%20Submission%20to%20Net%20Zero%20Economy%20Authority.pdf
- Chicago
- Institute for Energy Economics and Financial Analysis. Community of Interest process for Eraring Power Station. 2025. https://ieefa.org/sites/default/files/2025-07/IEEFA%20Submission%20to%20Net%20Zero%20Economy%20Authority.pdf.
- Wikipedia
- {{cite press release |author=Institute for Energy Economics and Financial Analysis |title=Community of Interest process for Eraring Power Station |date=23 July 2025 |url=https://ieefa.org/sites/default/files/2025-07/IEEFA%20Submission%20to%20Net%20Zero%20Economy%20Authority.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document ieefa-001448)}}
- BibTeX
- @misc{instituteforenergyeconomicsandfinancialanalysis2025community, author = {{Institute for Energy Economics and Financial Analysis}}, title = {{Community of Interest process for Eraring Power Station}}, publisher = {Institute for Energy Economics and Financial Analysis}, year = {2025}, month = jul, url = {https://ieefa.org/sites/default/files/2025-07/IEEFA%20Submission%20to%20Net%20Zero%20Economy%20Authority.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document ieefa-001448} }
Full text
Collected · Record updated