South Korean offshore wind success requires a public-private approach to project realization
Summary
South Korea aims to deploy 45-55GW of offshore wind capacity by 2035-2040, but the IEEFA argues that success requires the government to proactively reduce developer risks through site identification and flexible policy frameworks.
Key insights
- South Korea has established two competing capacity targets: a Medium-term Plan targeting 55GW by 2035 and a 12th Basic Plan for Long-term Electricity Supply and Demand (BPLE) targeting 45GW by 2040.
- The pace of South Korea's planned offshore wind buildout is unprecedented globally, with annual additions of approximately 4GW, which is nearly double the historical annual capacity rate of all European countries combined.
- The Offshore Wind Special Act aims to resolve historical development constraints by shifting to government-approved development zones, consolidating approvals into a 'single window' process, and creating a stakeholder reconciliation body for dispute resolution.
- Rapidly imposing strict localization requirements for the supply chain could discourage international participants and increase costs, as evidenced by trade disputes and project delays in Taiwan.
- South Korean wind tariffs have been consistently lowered despite limited domestic cost data, with the tariff cap falling 22% between early 2024 and late 2026, and a further 50% reduction targeted by 2035.
- To reduce developer risk and cost, the government should provide industry-standard data on wind resources, bathymetry, and ocean conditions, and consider extending power purchase contracts to 25 or 30 years.
Cite the original document
- APA
- Hauber, G. (2026). South Korean offshore wind success requires a public-private approach to project realization. Institute for Energy Economics and Financial Analysis. https://ieefa.org/sites/default/files/2026-09/IEEFA%20Briefing%20Note_South%20Korean%20offshore%20wind%20success%20requires%20a%20public-private%20approach%20to%20project%20realization_September2026.pdf
- Chicago
- Hauber, Grant. South Korean offshore wind success requires a public-private approach to project realization. Institute for Energy Economics and Financial Analysis, 2026. https://ieefa.org/sites/default/files/2026-09/IEEFA%20Briefing%20Note_South%20Korean%20offshore%20wind%20success%20requires%20a%20public-private%20approach%20to%20project%20realization_September2026.pdf.
- Wikipedia
- {{cite report |last1=Hauber |first1=Grant |title=South Korean offshore wind success requires a public-private approach to project realization |publisher=Institute for Energy Economics and Financial Analysis |date=September 2026 |url=https://ieefa.org/sites/default/files/2026-09/IEEFA%20Briefing%20Note_South%20Korean%20offshore%20wind%20success%20requires%20a%20public-private%20approach%20to%20project%20realization_September2026.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document ieefa-001349)}}
- BibTeX
- @techreport{hauber2026south, author = {Hauber, Grant}, title = {{South Korean offshore wind success requires a public-private approach to project realization}}, institution = {Institute for Energy Economics and Financial Analysis}, year = {2026}, month = sep, url = {https://ieefa.org/sites/default/files/2026-09/IEEFA%20Briefing%20Note_South%20Korean%20offshore%20wind%20success%20requires%20a%20public-private%20approach%20to%20project%20realization_September2026.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document ieefa-001349} }
Full text
Collected · Record updated