Summary

AI-generated

This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.

Learn more about AI enrichment

IEEFA argues that the Orderly Exit Management Framework should be avoided as it risks propping up emissions-intensive generators and disincentivising renewable investment, suggesting instead that governments build a larger reserve of flexible capacity.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • The implementation of an Orderly Exit Management Framework (OEMF) or similar mechanisms to prop up ageing, emissions-intensive generators is undesirable due to risks of market distortion, increased emissions, and the disincentivisation of investment in new renewables and storage projects.
  • To ensure reliability without subsidising coal, governments should use competitive auctions to expand the Reliability Electricity Reserve Trader (RERT) into a larger reserve of demand reduction and supply options deployable over two to three years.
  • Operators of large generating units should be required to provide financial bonds to the government, which would be forfeited if the unit fails to meet minimum reliability performance requirements or closes without adequate notice.
  • If an OEMF is implemented, the 'system needs shortfall' assessment should be based on the reliability standard rather than the Interim Reliability Measure (IRM), as the IRM does not reflect consumer willingness to pay.
  • Any commercial arrangement to subsidise emissions-intensive generators should include explicit contract terms requiring plant closure as soon as the reliability shortfall is bridged by new supply or demand reduction.
  • Payment structures for generators under an OEMF should be decoupled from megawatt-hours generated and instead tied to megawatts offered for dispatch during high-risk shortfall periods to discourage unnecessary generation and emissions.
  • The government should avoid recovering the costs of the OEMF through consumer electricity bills, as this would increase costs for consumers; instead, costs should be included in the jurisdictional government budget.

Cite the original document

APA
Institute for Energy Economics and Financial Analysis (2024). Orderly Exit Management Framework Consultation. https://ieefa.org/sites/default/files/2024-02/IEEFA%20-%20OEMF%20Consultation%20Submission.pdf
Chicago
Institute for Energy Economics and Financial Analysis. Orderly Exit Management Framework Consultation. 2024. https://ieefa.org/sites/default/files/2024-02/IEEFA%20-%20OEMF%20Consultation%20Submission.pdf.
Wikipedia
{{cite press release |author=Institute for Energy Economics and Financial Analysis |title=Orderly Exit Management Framework Consultation |date=2 February 2024 |url=https://ieefa.org/sites/default/files/2024-02/IEEFA%20-%20OEMF%20Consultation%20Submission.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document ieefa-001323)}}
BibTeX
@misc{instituteforenergyeconomicsandfinancialanalysis2024orderly, author = {{Institute for Energy Economics and Financial Analysis}}, title = {{Orderly Exit Management Framework Consultation}}, publisher = {Institute for Energy Economics and Financial Analysis}, year = {2024}, month = feb, url = {https://ieefa.org/sites/default/files/2024-02/IEEFA%20-%20OEMF%20Consultation%20Submission.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document ieefa-001323} }

Full text

Collected · Record updated