This report finds that Guyana's inability to settle pre-contract cost claims, potentially totaling $900 million, indicates fundamental fiscal distress and risks delaying the country's realization of substantial oil revenues.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • Guyana is required to reimburse ExxonMobil for costs incurred between 1999 and 2015 to develop oil resources, but a settlement has not been reached despite a government audit.
  • While Guyana agreed to a partial claim of $460.2 million, the total pre-contract costs are estimated by some to be around $900 million, an amount that could equal more than two years of the country's oil profits at current production rates.
  • The Guyanese government lacks the basic fiscal and project management skills to review claims, complete audits, and negotiate to protect its interests, leaving it unable to verify if oil lift payments are accurate.
  • The 2016 production-sharing agreement allows the contractor to recover 100% of exploration and development costs, capped at 75% of revenues, meaning Guyana only receives a minimum payment of 12.5% of gross revenues until these costs are fully paid.
  • There is a significant lack of transparency from both the Guyanese government and the oil companies regarding the details of pre-contract costs and regular production and cost reports.
  • The timing of oil lifts has become inconsistent, with the gap between the fourth and seventh lift increasing to 81 days compared to a previous average of 55 days, potentially indicating project execution problems by ExxonMobil.

Cite the original document

APA
Sanzillo, T. (2021). Guyana’s Past Debt: Contractual Loose Ends Tangle Path to Profit. Institute for Energy Economics and Financial Analysis. https://ieefa.org/wp-content/uploads/2021/10/Guyanas-Past-Debt-Contractual-Loose-Ends-Tangle-Path-to-Profit_October-2021.pdf
Chicago
Sanzillo, Tom. Guyana’s Past Debt: Contractual Loose Ends Tangle Path to Profit. Institute for Energy Economics and Financial Analysis, 2021. https://ieefa.org/wp-content/uploads/2021/10/Guyanas-Past-Debt-Contractual-Loose-Ends-Tangle-Path-to-Profit_October-2021.pdf.
Wikipedia
{{cite report |last1=Sanzillo |first1=Tom |title=Guyana’s Past Debt: Contractual Loose Ends Tangle Path to Profit |publisher=Institute for Energy Economics and Financial Analysis |date=October 2021 |url=https://ieefa.org/wp-content/uploads/2021/10/Guyanas-Past-Debt-Contractual-Loose-Ends-Tangle-Path-to-Profit_October-2021.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document ieefa-001298)}}
BibTeX
@techreport{sanzillo2021guyanas, author = {Sanzillo, Tom}, title = {{Guyana’s Past Debt: Contractual Loose Ends Tangle Path to Profit}}, institution = {Institute for Energy Economics and Financial Analysis}, year = {2021}, month = oct, url = {https://ieefa.org/wp-content/uploads/2021/10/Guyanas-Past-Debt-Contractual-Loose-Ends-Tangle-Path-to-Profit_October-2021.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document ieefa-001298} }

Full text

Collected · Record updated