The report concludes that Formosa Plastics' Sunshine Project in Louisiana is unviable due to a convergence of rising construction costs, oversupplied markets, and significant legal and regulatory hurdles.
Key insights
- Construction costs for the Sunshine Project have risen significantly, with S&P Global estimating an increase from $9.4 billion in 2018 to $12 billion by 2020, and likely higher since then due to inflation and commodity prices.
- The project faces a market environment characterized by oversupply, with global ethylene plant capacity expected to increase by 33 percent between 2021-26 compared to 2016-2020.
- Polyethylene (PE) margins are highly sensitive to feedstock costs; IEEFA analysis suggests a 10 percent increase in ethane prices combined with a 10 percent decrease in ethylene prices could reduce margins by 50 percent.
- The U.S. Army Corps of Engineers has suspended the project's Clean Water Act permit and now requires an environmental impact statement (EIS), a process expected to take at least a year.
- The project's air pollution permits are under litigation in Louisiana due to concerns regarding cumulative toxic air emissions and environmental justice, specifically the disproportionate impact on African-American residents in a heavily polluted area.
- S&P Global suggests the project is not viable and indicates that Formosa and similar companies may pivot toward specialty products and electronic materials for electric vehicles due to global pressure to reduce carbon and plastic pollution.
Cite the original document
- APA
- Sanzillo, T., Sinha, A., & Mattei, S. (2022). Formosa’s Louisiana Project Update: Supply and Demand Dynamics, Legal Challenges Bode Ill. Institute for Energy Economics and Financial Analysis. https://ieefa.org/sites/default/files/2022-04/Formosa-Louisiana-Project-Update_March-2022.pdf
- Chicago
- Sanzillo, Tom, Abhishek Sinha, and Suzanne Mattei. Formosa’s Louisiana Project Update: Supply and Demand Dynamics, Legal Challenges Bode Ill. Institute for Energy Economics and Financial Analysis, 2022. https://ieefa.org/sites/default/files/2022-04/Formosa-Louisiana-Project-Update_March-2022.pdf.
- Wikipedia
- {{cite report |last1=Sanzillo |first1=Tom |last2=Sinha |first2=Abhishek |last3=Mattei |first3=Suzanne |title=Formosa’s Louisiana Project Update: Supply and Demand Dynamics, Legal Challenges Bode Ill |publisher=Institute for Energy Economics and Financial Analysis |date=March 2022 |url=https://ieefa.org/sites/default/files/2022-04/Formosa-Louisiana-Project-Update_March-2022.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document ieefa-001245)}}
- BibTeX
- @techreport{sanzillo2022formosas, author = {Sanzillo, Tom and Sinha, Abhishek and Mattei, Suzanne}, title = {{Formosa’s Louisiana Project Update: Supply and Demand Dynamics, Legal Challenges Bode Ill}}, institution = {Institute for Energy Economics and Financial Analysis}, year = {2022}, month = mar, url = {https://ieefa.org/sites/default/files/2022-04/Formosa-Louisiana-Project-Update_March-2022.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document ieefa-001245} }
Full text
Collected · Record updated