Summary

AI-generated

This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.

Learn more about AI enrichment

This report finds that FirstEnergy's heavy reliance on merchant coal generation has led to a financial decline characterized by falling revenues and rising debt, prompting the company to seek regulatory bailouts for its power plants.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • FirstEnergy's financial metrics have trended downward since its 2011 merger with Allegheny Energy, with total annual revenues dropping from $16.1 billion in 2011 to $14.9 billion in 2013, and net income falling from $869 million to $392 million over the same period.
  • The company has relied on approximately $5.8 billion in "one-time resources" between 2011 and 2013, including asset sales and short-term borrowings, to mask a structural imbalance where recurring revenues are insufficient to cover recurring expenses.
  • FirstEnergy's strategy of expanding retail electricity sales has failed, leading the company to shed 100,000 retail customers in the first half of 2014 and announce a withdrawal from the Illinois retail market.
  • In 2013, FirstEnergy transferred the 1,576 MW Harrison coal plant from a merchant subsidiary to the regulated Mon Power at a price $257 million above book value, shifting the plant's financial risk to West Virginia ratepayers.
  • FirstEnergy is seeking a regulatory bailout in Ohio via a power purchase agreement for the W. H. Sammis coal plant, Davis-Besse nuclear plant, and its share of the OVEC coal plants, which it estimates would cost Ohio ratepayers $404 million (net present value) from 2016-2018.
  • The company has actively opposed energy efficiency and renewable energy standards, leading the successful 2014 campaign for Ohio Senate Bill 310, which froze the state's energy efficiency and renewable energy standards for two years.
  • FirstEnergy's failure to bid its full energy efficiency savings into the PJM capacity market for the 2015/16 auction is estimated to have cost ratepayers in northern Ohio approximately $600 million by artificially inflating capacity prices.
  • FirstEnergy profited from the federal Bureau of Land Management's coal leasing program at the Signal Peak mine in Montana, exporting coal to Asian markets to avoid paying 12.5% royalties to the U.S. government.
  • The company's merchant generation fleet has performed poorly, with the 2.4 GW Bruce Mansfield plant failing to clear the 2017/2018 capacity auction, meaning it will receive no capacity market revenues for that period.

Cite the original document

APA
Sanzillo, T., & Kunkel, C. (2014). FirstEnergy. Institute for Energy Economics and Financial Analysis. https://ieefa.org/wp-content/uploads/2014/10/First-Energy_-A-Major-Utility-Seeks-a-Subsidized-Turnaround-OCT2014.pdf
Chicago
Sanzillo, Tom, and Cathy Kunkel. FirstEnergy. Institute for Energy Economics and Financial Analysis, 2014. https://ieefa.org/wp-content/uploads/2014/10/First-Energy_-A-Major-Utility-Seeks-a-Subsidized-Turnaround-OCT2014.pdf.
Wikipedia
{{cite report |last1=Sanzillo |first1=Tom |last2=Kunkel |first2=Cathy |title=FirstEnergy |publisher=Institute for Energy Economics and Financial Analysis |date=October 2014 |url=https://ieefa.org/wp-content/uploads/2014/10/First-Energy_-A-Major-Utility-Seeks-a-Subsidized-Turnaround-OCT2014.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document ieefa-001237)}}
BibTeX
@techreport{sanzillo2014firstenergy, author = {Sanzillo, Tom and Kunkel, Cathy}, title = {{FirstEnergy}}, institution = {Institute for Energy Economics and Financial Analysis}, year = {2014}, month = oct, url = {https://ieefa.org/wp-content/uploads/2014/10/First-Energy_-A-Major-Utility-Seeks-a-Subsidized-Turnaround-OCT2014.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document ieefa-001237} }

Full text

Collected · Record updated