CIL misleading investors, extractable reserves could be exhausted in 17 years
Summary
This report argues that Coal India Limited has misled investors by overstating its extractable reserves, which could be exhausted within 17 years at targeted growth rates.
Key insights
- Coal India Limited's (CIL) extractable reserves as of April 2011 were estimated by its own subsidiary, CMPDIL, to be 18.2 billion tonnes, which is 16% lower than the 21.7 billion tonnes cited in the company's 2010 IPO Red Herring document.
- At targeted growth rates, CIL's extractable coal reserves could be exhausted within 17 years (by 2030), which is shorter than the typical thirty-year planning period for the coal-fired power plants currently under construction or approval in India.
- CIL's reserve estimates may be further overestimated because the company has not conducted feasibility studies as defined by the UNFC, nor has it assessed geographical and land use limitations such as forest cover, agricultural land, and water bodies.
- CIL is poorly positioned to maintain production because it has neglected underground mining technology, with over 90% of its production coming from open cast mines at depths of less than 150 meters, while 40% of India's coal resource lies deeper than 300 meters.
- Approximately 57% of CIL's extractable reserves are located in coalfields with extensive forest cover, increasing the likelihood of regulatory delays, legal challenges, and community opposition.
- CIL's exploration efforts are inadequate, with the subsidiary CMPDIL performing about 500,000 meters of drilling per annum against a recommended capacity of 1.5 million meters.
- A continued domestic coal shortage may force India to increase its reliance on more expensive imports, which negatively impacts the current account deficit and the value of the rupee.
Cite the original document
- APA
- Fernandes, A., & Sanzillo, T. (2013). CIL misleading investors, extractable reserves could be exhausted in 17 years. Institute for Energy Economics and Financial Analysis. https://ieefa.org/sites/default/files/2022-04/Coal-India-Running-on-Empty.pdf
- Chicago
- Fernandes, Ashish, and Tom Sanzillo. CIL misleading investors, extractable reserves could be exhausted in 17 years. Institute for Energy Economics and Financial Analysis, 2013. https://ieefa.org/sites/default/files/2022-04/Coal-India-Running-on-Empty.pdf.
- Wikipedia
- {{cite report |last1=Fernandes |first1=Ashish |last2=Sanzillo |first2=Tom |title=CIL misleading investors, extractable reserves could be exhausted in 17 years |publisher=Institute for Energy Economics and Financial Analysis |date=September 2013 |url=https://ieefa.org/sites/default/files/2022-04/Coal-India-Running-on-Empty.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document ieefa-001098)}}
- BibTeX
- @techreport{fernandes2013cil, author = {Fernandes, Ashish and Sanzillo, Tom}, title = {{CIL misleading investors, extractable reserves could be exhausted in 17 years}}, institution = {Institute for Energy Economics and Financial Analysis}, year = {2013}, month = sep, url = {https://ieefa.org/sites/default/files/2022-04/Coal-India-Running-on-Empty.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document ieefa-001098} }
Full text
Collected · Record updated