British Columbia LNG Project Costs Rising Again
Summary
This report finds that ballooning construction costs for the Coastal GasLink pipeline and regulatory challenges in British Columbia are creating significant financial risks that may make Canadian LNG projects less competitive than those on the U.S. Gulf Coast.
Key insights
- Construction costs for the Coastal GasLink (CGL) pipeline, which supplies the LNG Canada project, increased by 70% between 2018 and 2022, rising from CAD$6.6 billion to CAD$11.2 billion, with further increases expected due to labour costs.
- High transportation tariffs on the CGL pipeline may incentivize independent western Canadian gas producers to sell their gas to U.S. markets rather than to B.C. coast LNG projects. For example, Tourmaline Oil estimated shipping costs from the Montney Basin to Louisiana at approximately CAD$1.12 per MMBtu, which is significantly lower than IEEFA's estimated costs for shipping via CGL.
- A B.C. Supreme Court decision regarding the Blueberry River First Nation's treaty rights led to a de facto moratorium on new drilling permits in 2021 and 2022. A subsequent agreement limits total annual land disturbance to 750 hectares per year, down from approximately 1,500 per year, which may constrain the pace of drilling needed to supply LNG Canada.
- British Columbia's new royalty regime, phased in starting September 1, 2022, increases minimum royalty rates from 3% to 5% and eliminates the deep well royalty program, adding further economic pressure to the upstream gas industry.
- The proposed Woodfibre LNG project in Squamish, B.C., has seen comprehensive cost estimates increase by roughly 135% since 2015, rising to CAD$6.6 billion, with only 21% of that increase attributed to general inflation.
- Woodfibre LNG's plan to use hydroelectric power from BC Hydro to lower its reported GHG intensity may conflict with B.C.'s broader electrification and decarbonization goals, as the project would consume 140 to 150 megawatts of power, enough to power over 100,000 homes.
Cite the original document
- APA
- Williams-Derry, C. (2023). British Columbia LNG Project Costs Rising Again. Institute for Energy Economics and Financial Analysis. https://ieefa.org/sites/default/files/2023-01/British%20Columbia%20LNG%20Project%20Costs%20Rising%20Again_February%202023.pdf
- Chicago
- Williams-Derry, Clark. British Columbia LNG Project Costs Rising Again. Institute for Energy Economics and Financial Analysis, 2023. https://ieefa.org/sites/default/files/2023-01/British%20Columbia%20LNG%20Project%20Costs%20Rising%20Again_February%202023.pdf.
- Wikipedia
- {{cite report |last1=Williams-Derry |first1=Clark |title=British Columbia LNG Project Costs Rising Again |publisher=Institute for Energy Economics and Financial Analysis |date=February 2023 |url=https://ieefa.org/sites/default/files/2023-01/British%20Columbia%20LNG%20Project%20Costs%20Rising%20Again_February%202023.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document ieefa-001049)}}
- BibTeX
- @techreport{williamsderry2023british, author = {Williams-Derry, Clark}, title = {{British Columbia LNG Project Costs Rising Again}}, institution = {Institute for Energy Economics and Financial Analysis}, year = {2023}, month = feb, url = {https://ieefa.org/sites/default/files/2023-01/British%20Columbia%20LNG%20Project%20Costs%20Rising%20Again_February%202023.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document ieefa-001049} }
Full text
Collected · Record updated