The document finds that Indian state governments and distribution companies (discoms) are increasingly restricting 'banking of power' facilities, which threatens the viability of open-access renewable energy projects and could hinder India's 2030 target of 450GW.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • Distribution companies (discoms) are restricting banking provisions to prevent high-paying Commercial & Industrial (C&I) consumers from shifting to alternative renewable energy procurement models.
  • Discoms justify banking restrictions by claiming financial losses because the national average power purchase cost (APPC) of Rs3.85/kWh for FY2021/22 is higher than the solar generation cost of Rs2-2.8/kWh.
  • The Ministry of Power's August 2021 draft rules propose restricting banking to a monthly basis and capping banked energy at 10% of a consumer's total annual electricity consumption.
  • There is significant regulatory inconsistency across Indian states; for example, Andhra Pradesh has completely withdrawn banking facilities, while Gujarat and Maharashtra have shifted from annual to monthly banking periods.
  • Restrictive banking regulations, particularly the shift to monthly banking or the total removal of facilities, lead to the loss of excess energy generation and make the open-access solar business model unviable.
  • The Commercial & Industrial (C&I) renewable energy segment represents only 2% to 14% of total installed capacity in key RE-rich states and contributes less than 1% of overall electricity generation in most of these states.
  • To mitigate the loss of unbanked excess energy, developers can utilize the Green Term Ahead Market (GTAM) or deploy Battery Energy Storage Solutions (BESS), though BESS increases PPA tariffs.

Cite the original document

APA
Gulia, J., Garg, V., & Banga, G. (2021). Banking Restrictions on Renewable Energy Projects in India. Institute for Energy Economics and Financial Analysis. https://ieefa.org/wp-content/uploads/2021/12/Banking-Restrictions-on-Renewable-Energy-Projects-in-India_December-2021.pdf
Chicago
Gulia, Jyoti, Vibhuti Garg, and Ginni Banga. Banking Restrictions on Renewable Energy Projects in India. Institute for Energy Economics and Financial Analysis, 2021. https://ieefa.org/wp-content/uploads/2021/12/Banking-Restrictions-on-Renewable-Energy-Projects-in-India_December-2021.pdf.
Wikipedia
{{cite report |last1=Gulia |first1=Jyoti |last2=Garg |first2=Vibhuti |last3=Banga |first3=Ginni |title=Banking Restrictions on Renewable Energy Projects in India |publisher=Institute for Energy Economics and Financial Analysis |date=December 2021 |url=https://ieefa.org/wp-content/uploads/2021/12/Banking-Restrictions-on-Renewable-Energy-Projects-in-India_December-2021.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document ieefa-000972)}}
BibTeX
@techreport{gulia2021banking, author = {Gulia, Jyoti and Garg, Vibhuti and Banga, Ginni}, title = {{Banking Restrictions on Renewable Energy Projects in India}}, institution = {Institute for Energy Economics and Financial Analysis}, year = {2021}, month = dec, url = {https://ieefa.org/wp-content/uploads/2021/12/Banking-Restrictions-on-Renewable-Energy-Projects-in-India_December-2021.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document ieefa-000972} }

Full text

Collected · Record updated