Bad Choice: The Risks, Costs and Viability of Proposed U.S. Nuclear Reactors in India
Summary
The report argues that the proposed construction of 12 nuclear reactors in India using Westinghouse AP1000 and GE-Hitachi ESBWR designs is economically unviable. It highlights significant risks including untested technology, land acquisition hurdles, and nuclear liability disputes. IEEFA estimates that the resulting electricity tariffs would be substantially higher than those of solar PV, which has seen a 65% price decline since 2010. The report concludes that the massive investment required—up to US $170 billion—would be better spent on sustainable solar capacity.
Key insights
- The proposed nuclear projects at Mithi Virdi and Kovvada utilize untested, first-of-a-kind reactor designs that are not currently operational anywhere in the world. The Mithi Virdi site would use the Westinghouse AP1000, which has faced technical problems and cost increases in other locations, while the Kovvada site would use the GE-Hitachi Economic Simplified Boiling Water Reactor (ESBWR), which is not under construction anywhere globally.
- Electricity tariffs from the proposed plants are projected to be significantly higher than current Indian averages and far more expensive than solar energy. For Mithi Virdi, first-year tariffs are estimated between Rs. 11.18 and Rs. 22.12 per KWH, with levelized tariffs from Rs. 9.05 to Rs. 17.75. Kovvada's first-year tariffs are estimated between Rs. 19.80 and Rs. 32.77 per KWH, with levelized tariffs from Rs. 15.85 to Rs. 26.04.
- The total investment required for the 12 proposed reactors is estimated to range from Rs. 6.3 lakh crores (US $95 billion) to 11.3 lakh crore rupees (US $170 billion). IEEFA questions the Indian government's ability to finance this while maintaining other energy investments in coal, renewables, and efficiency.
- Construction timelines are likely to be much longer than official claims. IEEFA estimates that if work began in 2017, the first reactors would not generate power until 2029 to 2032, as the process typically takes 11 to 15 years including licensing and site preparation.
- Significant risks threaten the projects' schedules and costs, specifically land acquisition delays due to the Right to Fair Compensation and Transparency in Land Acquisition Act 2013, and disputes over nuclear accident liability. GE has specifically ruled out investments under current Indian liability laws.
- The report identifies a high risk of 'teething problems' during initial operations, citing the Kudankulam nuclear plant in Tamil Nadu. Kudankulam 1 took 11.5 years to connect to the grid instead of the projected 67-69 months, and experienced a seven-month outage shortly after starting commercial operations.
- Solar photovoltaic (PV) energy is presented as a superior alternative, with tariffs in India having declined by 65% since 2010. IEEFA forecasts a further annual decline of 5% to 8% over the next two decades, making solar significantly cheaper, faster to deploy, and more sustainable than the proposed nuclear plants.
Cite the original document
- APA
- Schlissel, D. A. (2016). Bad Choice: The Risks, Costs and Viability of Proposed U.S. Nuclear Reactors in India. Institute for Energy Economics and Financial Analysis. https://ieefa.org/sites/default/files/resources/Bad-Choice_The-Risks-Costs-and-Viability-of-Proposed-US-Nuclear-Reactors-in-India_-March-2016.pdf
- Chicago
- Schlissel, David A. Bad Choice: The Risks, Costs and Viability of Proposed U.S. Nuclear Reactors in India. Institute for Energy Economics and Financial Analysis, 2016. https://ieefa.org/sites/default/files/resources/Bad-Choice_The-Risks-Costs-and-Viability-of-Proposed-US-Nuclear-Reactors-in-India_-March-2016.pdf.
- Wikipedia
- {{cite report |last1=Schlissel |first1=David A. |title=Bad Choice: The Risks, Costs and Viability of Proposed U.S. Nuclear Reactors in India |publisher=Institute for Energy Economics and Financial Analysis |date=March 2016 |url=https://ieefa.org/sites/default/files/resources/Bad-Choice_The-Risks-Costs-and-Viability-of-Proposed-US-Nuclear-Reactors-in-India_-March-2016.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document ieefa-000963)}}
- BibTeX
- @techreport{schlissel2016bad, author = {Schlissel, David A.}, title = {{Bad Choice: The Risks, Costs and Viability of Proposed U.S. Nuclear Reactors in India}}, institution = {Institute for Energy Economics and Financial Analysis}, year = {2016}, month = mar, url = {https://ieefa.org/sites/default/files/resources/Bad-Choice_The-Risks-Costs-and-Viability-of-Proposed-US-Nuclear-Reactors-in-India_-March-2016.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document ieefa-000963} }
Full text
Collected · Record updated