The Atlantic Coast Pipeline (ACP), a 600-mile project owned by Dominion, Duke Energy, and Southern Company, faces significant financial risk as its original demand justifications evaporate. While 96% of capacity is contracted by regulated utility affiliates, the briefing finds that updated Integrated Resource Plans (IRPs) from Dominion and Duke Energy show flat or declining natural gas consumption and delayed plant construction. With the increasing competitiveness of wind, solar, and battery storage, the authors argue that state regulators in Virginia and North Carolina may refuse to allow the utilities to pass the project's inflated costs—now estimated at $6.5 to $7 billion—on to customers.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • The Atlantic Coast Pipeline's estimated costs have increased by approximately 30% from the original $5.1 billion projection, now reaching between $6.5 billion and $7 billion, excluding financing costs.
  • The pipeline's capacity is almost entirely reserved by affiliates of its owners, meaning cost recovery depends on the approval of state utility regulators in Virginia and North Carolina.
  • Dominion Virginia Power's 2018 Integrated Resource Plan (IRP) indicates that in four out of five modelled scenarios, natural gas consumption in 2033 will be equal to or lower than 2019 levels.
  • The Virginia State Corporation Commission rejected Dominion's 2018 IRP, citing doubts about the accuracy of the company's load forecasts, which have historically been overstated.
  • Duke Energy has significantly delayed the construction of new natural gas plants, pushing major capacity additions originally planned for 2020-2022 back to 2027-2028 due to downward revisions in load forecasts.
  • The economic viability of new natural gas combined cycle (CCGT) plants is being undermined by the falling costs of wind, solar, and battery storage, which are now competitive for bulk and dispatchable generation in the U.S.

Cite the original document

APA
Kunkel, C., & Stockman, L. (2019). The Vanishing Need for the Atlantic Coast Pipeline. Institute for Energy Economics and Financial Analysis. https://ieefa.org/sites/default/files/resources/Atlantic-Coast-Pipeline_January-2019.pdf
Chicago
Kunkel, Cathy, and Lorne Stockman. The Vanishing Need for the Atlantic Coast Pipeline. Institute for Energy Economics and Financial Analysis, 2019. https://ieefa.org/sites/default/files/resources/Atlantic-Coast-Pipeline_January-2019.pdf.
Wikipedia
{{cite report |last1=Kunkel |first1=Cathy |last2=Stockman |first2=Lorne |title=The Vanishing Need for the Atlantic Coast Pipeline |publisher=Institute for Energy Economics and Financial Analysis |date=January 2019 |url=https://ieefa.org/sites/default/files/resources/Atlantic-Coast-Pipeline_January-2019.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document ieefa-000950)}}
BibTeX
@techreport{kunkel2019vanishing, author = {Kunkel, Cathy and Stockman, Lorne}, title = {{The Vanishing Need for the Atlantic Coast Pipeline}}, institution = {Institute for Energy Economics and Financial Analysis}, year = {2019}, month = jan, url = {https://ieefa.org/sites/default/files/resources/Atlantic-Coast-Pipeline_January-2019.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document ieefa-000950} }

Full text

Collected · Record updated