4-billion-bailout-in-the-buckeye-state-firstenergy-plan-will-cost-customers-for-years-to-come-_feb-2016-baf07350284b6ca2.pdf

Report an error

Summary

AI-generated

This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.

Learn more about AI enrichment

This report analyzes FirstEnergy's proposed Retail Rate Stability Rider in Ohio, concluding that it would result in a net cost of $4 billion to ratepayers by subsidizing unprofitable, aging power plants.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • FirstEnergy's proposal to use a Retail Rate Stability Rider (Rider RRS) would transfer the costs and risks of the W.H. Sammis, Clifty Creek, and Kyger Creek coal plants, as well as the Davis-Besse nuclear plant, to captive customers.
  • While FirstEnergy claims the proposal would provide a net benefit of $561 million over eight years (June 1, 2016, to May 31, 2024), IEEFA estimates it would actually result in a net cost to ratepayers of approximately $4 billion.
  • The proposal guarantees FirstEnergy and its shareholders a 10.38% return on equity each year, while the ratepayers bear all the operational and market risks.
  • The economic viability of these plants is undermined by a precipitous decline in natural gas prices, increased competition from wind and solar PV, and relatively flat electric demand in the PJM region.
  • FirstEnergy's financial projections are based on inflated forecasts for natural gas and electricity market prices; for example, it projected 2015 gas prices at $4.34 per MMBtu while actual prices were $2.63.
  • The aging of the coal plants (with Clifty Creek and Kyger Creek units averaging 60 years old) is expected to lead to higher operating and maintenance costs and degraded performance.
  • PJM's 2016 load forecasts show significant reductions in projected summer peak demands and energy usage compared to 2014 forecasts, further reducing the need for capacity from these plants.
  • The report suggests that instead of a bailout, Ohio should implement an economic-transition plan to support workers and communities affected by the closure of obsolete plants, citing examples from New York and Chicago.

Cite the original document

APA
Institute for Energy Economics and Financial Analysis (n.d.). 4-billion-bailout-in-the-buckeye-state-firstenergy-plan-will-cost-customers-for-years-to-come-_feb-2016-baf07350284b6ca2.pdf. https://ieefa.org/sites/default/files/resources/4-Billion-Bailout-in-the-Buckeye-State-FirstEnergy-Plan-Will-Cost-Customers-for-Years-to-Come-_Feb-2016.pdf
Chicago
Institute for Energy Economics and Financial Analysis. 4-billion-bailout-in-the-buckeye-state-firstenergy-plan-will-cost-customers-for-years-to-come-_feb-2016-baf07350284b6ca2.pdf. n.d. https://ieefa.org/sites/default/files/resources/4-Billion-Bailout-in-the-Buckeye-State-FirstEnergy-Plan-Will-Cost-Customers-for-Years-to-Come-_Feb-2016.pdf.
Wikipedia
{{cite report |author=Institute for Energy Economics and Financial Analysis |title=4-billion-bailout-in-the-buckeye-state-firstenergy-plan-will-cost-customers-for-years-to-come-_feb-2016-baf07350284b6ca2.pdf |url=https://ieefa.org/sites/default/files/resources/4-Billion-Bailout-in-the-Buckeye-State-FirstEnergy-Plan-Will-Cost-Customers-for-Years-to-Come-_Feb-2016.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document ieefa-000903)}}
BibTeX
@techreport{instituteforenergyeconomicsandfinancialanalysisnd4billionbailoutinthebuckeyestatefirstenergyplanwillcostcustomersforyearstocomefeb2016baf07350284b6ca2pdf, author = {{Institute for Energy Economics and Financial Analysis}}, title = {{4-billion-bailout-in-the-buckeye-state-firstenergy-plan-will-cost-customers-for-years-to-come-\_feb-2016-baf07350284b6ca2.pdf}}, institution = {Institute for Energy Economics and Financial Analysis}, url = {https://ieefa.org/sites/default/files/resources/4-Billion-Bailout-in-the-Buckeye-State-FirstEnergy-Plan-Will-Cost-Customers-for-Years-to-Come-_Feb-2016.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document ieefa-000903} }