Assessing Effectiveness of India's Solar Production Linked Incentive Scheme

Report an error

Summary

AI-generated

This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.

Learn more about AI enrichment

The report finds that while India's solar PLI scheme has significantly expanded domestic module and cell capacity, it has fallen short of its targets for commissioned capacity, investment, and job creation due to upstream integration challenges and policy uncertainties.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • As of June 2025, India's solar manufacturing capacity reached 120GW for modules and 29.3GW for cells, with post-2022 additions representing increases of 216% and 344% respectively.
  • The PLI scheme has failed to meet its primary targets by June 2025, with only 31GW of the targeted 65GW module capacity commissioned, and investment and job creation falling significantly below the goals of Rs94,000 crore and 1.95 lakh direct jobs.
  • India remains heavily dependent on imports for upstream components, as all existing polysilicon and wafer capacities were created solely through the PLI scheme, while only 56% of module and 14% of polysilicon capacity targets have been achieved.
  • Solar PLI awardees face a cumulative monetary risk of up to Rs41,834 crore (~US$4.80 billion) due to non-compliance, which includes lost incentives, unrealised revenue, and direct penalties via bank guarantee encashment.
  • Implementation is hindered by policy asymmetries, such as the contrast between unrestricted polysilicon and wafer imports and module restrictions under the Approved List of Models and Manufacturers (ALMM), as well as reliance on Chinese technical expertise and machinery.

Cite the original document

APA
Tiwari, V. G. P. S. C. H. T. A. G. S. (2025). Assessing Effectiveness of India's Solar Production Linked Incentive Scheme. Institute for Energy Economics and Financial Analysis. https://ieefa.org/resources/assessing-effectiveness-indias-solar-production-linked-incentive-scheme
Chicago
Tiwari, Vibhuti Garg Prabhakar Sharma Chirag H. Tewani Aman Gupta Soni. Assessing Effectiveness of India's Solar Production Linked Incentive Scheme. Institute for Energy Economics and Financial Analysis, 2025. https://ieefa.org/resources/assessing-effectiveness-indias-solar-production-linked-incentive-scheme.
Wikipedia
{{cite report |last1=Tiwari |first1=Vibhuti Garg Prabhakar Sharma Chirag H. Tewani Aman Gupta Soni |title=Assessing Effectiveness of India's Solar Production Linked Incentive Scheme |publisher=Institute for Energy Economics and Financial Analysis |date=11 December 2025 |url=https://ieefa.org/resources/assessing-effectiveness-indias-solar-production-linked-incentive-scheme |access-date=5 November 2026 |via=Climate Insights Directory (document ieefa-000855)}}
BibTeX
@techreport{tiwari2025assessing, author = {Tiwari, Vibhuti Garg Prabhakar Sharma Chirag H. Tewani Aman Gupta Soni}, title = {{Assessing Effectiveness of India's Solar Production Linked Incentive Scheme}}, institution = {Institute for Energy Economics and Financial Analysis}, year = {2025}, month = dec, url = {https://ieefa.org/resources/assessing-effectiveness-indias-solar-production-linked-incentive-scheme}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document ieefa-000855} }

Full text

Collected · Record updated