Summary

AI-generated

This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.

Learn more about AI enrichment

The author warns against the proliferation of new natural gas pipelines in West Virginia, citing a lack of coordinated planning and the risk of overbuilding. The document highlights the Atlantic Coast Pipeline as an example where affiliated utilities may be incentivized to build redundant capacity to earn profits through customer rates. It further notes that proposed pipeline capacity significantly exceeds the expected lifespan of recoverable gas from the Marcellus and Utica shales.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • There is a lack of a coordinated planning process for natural gas pipelines compared to other major infrastructure like electricity transmission, which can lead to unnecessary construction.
  • The Federal Energy Regulatory Commission (FERC) may find a "significant evidence of need" for a pipeline if a company secures advance contracts for most of its capacity, even if those contracts are with the company's own regulated subsidiaries, allowing them to pass costs to ratepayers and earn a profit.
  • The Atlantic Coast Pipeline is cited as a case of potential redundancy, as Dominion has contracted for capacity to supply two Virginia plants despite already having twenty-year contracts with another pipeline for the same plants.
  • Proposed pipeline capacity from the Marcellus and Utica shales is disproportionate to the available gas reserves; based on a 2014 Moody’s Investor Service conclusion, proposed pipelines could transport nearly 10 trillion cubic feet per year, meaning the 122 trillion cubic feet of recoverable gas would last less than 15 years.
  • A study by the Massachusetts Attorney General found that New England could meet its electricity needs through 2030 without the construction of new pipelines.

Cite the original document

APA
Kunkel, C. (2016). Note: Caution Zeal Around More US Gas Pipelines. Institute for Energy Economics and Financial Analysis. https://ieefa.org/resources/note-caution-zeal-around-more-us-gas-pipelines
Chicago
Kunkel, Cathy. Note: Caution Zeal Around More US Gas Pipelines. Institute for Energy Economics and Financial Analysis, 2016. https://ieefa.org/resources/note-caution-zeal-around-more-us-gas-pipelines.
Wikipedia
{{cite press release |last1=Kunkel |first1=Cathy |title=Note: Caution Zeal Around More US Gas Pipelines |publisher=Institute for Energy Economics and Financial Analysis |date=18 January 2016 |url=https://ieefa.org/resources/note-caution-zeal-around-more-us-gas-pipelines |access-date=5 November 2026 |via=Climate Insights Directory (document ieefa-000847)}}
BibTeX
@misc{kunkel2016note, author = {Kunkel, Cathy}, title = {{Note: Caution Zeal Around More US Gas Pipelines}}, publisher = {Institute for Energy Economics and Financial Analysis}, year = {2016}, month = jan, url = {https://ieefa.org/resources/note-caution-zeal-around-more-us-gas-pipelines}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document ieefa-000847} }

Full text

Collected · Record updated