Puerto Rico’s Virtual Power Plant Contributes Grid Reliability During Summer Peak
Summary
The document finds that Puerto Rico's virtual power plant, comprising 500MW of distributed battery capacity, has successfully reduced rolling blackouts during peak demand, suggesting that battery storage is a faster and more sustainable solution than new gas plants.
Key insights
- The Customer Battery Energy Sharing program, acting as a virtual power plant (VPP), enrolled 81,104 customers by October 2025, providing 500MW of battery capacity. Between June and October 2025, this VPP was dispatched 49 times, averaging 33MW per event, often to mitigate or prevent rolling blackouts.
- Puerto Rico has over 1200MW of utility-scale battery storage in development, including the Accelerated Storage Addition Program (ASAP), Genera’s 430MW program, and PREPA procurements. These projects are expected to become operational faster than the five to six years needed for gas power plants.
- Despite the effectiveness of battery storage, the Puerto Rico Energy Bureau has approved a 560MW gas plant and the procurement of 3000MW of additional centralized power plant capacity, which the author argues risks fiscal instability and hinders the 100% renewable energy target for 2050.
- LUMA's October 2024 Resource Adequacy Study estimated that in the base case for fiscal year 2025, Puerto Rico would experience rolling blackouts due to generation shortfalls on 36 days.
Cite the original document
- APA
- Kunkel, C. (2025). Puerto Rico’s Virtual Power Plant Contributes Grid Reliability During Summer Peak. Institute for Energy Economics and Financial Analysis. https://ieefa.org/resources/puerto-ricos-virtual-power-plant-contributes-grid-reliability-during-summer-peak
- Chicago
- Kunkel, Cathy. Puerto Rico’s Virtual Power Plant Contributes Grid Reliability During Summer Peak. Institute for Energy Economics and Financial Analysis, 2025. https://ieefa.org/resources/puerto-ricos-virtual-power-plant-contributes-grid-reliability-during-summer-peak.
- Wikipedia
- {{cite press release |last1=Kunkel |first1=Cathy |title=Puerto Rico’s Virtual Power Plant Contributes Grid Reliability During Summer Peak |publisher=Institute for Energy Economics and Financial Analysis |date=16 December 2025 |url=https://ieefa.org/resources/puerto-ricos-virtual-power-plant-contributes-grid-reliability-during-summer-peak |access-date=5 November 2026 |via=Climate Insights Directory (document ieefa-000632)}}
- BibTeX
- @misc{kunkel2025puerto, author = {Kunkel, Cathy}, title = {{Puerto Rico’s Virtual Power Plant Contributes Grid Reliability During Summer Peak}}, publisher = {Institute for Energy Economics and Financial Analysis}, year = {2025}, month = dec, url = {https://ieefa.org/resources/puerto-ricos-virtual-power-plant-contributes-grid-reliability-during-summer-peak}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document ieefa-000632} }
Full text
Collected · Record updated