Geothermal resources offer ramp from risky, costly nuclear project

Report an error

Summary

AI-generated

This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.

Learn more about AI enrichment

The document asserts that geothermal power proposals from NV Energy are significantly cheaper and less risky than the NuScale small modular reactor (SMR) project backed by UAMPS. It recommends that UAMPS members use current contract off-ramps to avoid potentially ruinous future power costs.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • NV Energy's geothermal proposals are more cost-effective than the NuScale SMR; the conventional geothermal proposal from Ormat Technologies is priced at $69/MWh and the closed-loop proposal is $70/MWh, both of which are lower than the updated $89/MWh estimate for the SMR.
  • The 140 MW of geothermal capacity proposed by NV Energy could meet the energy needs of the 27 UAMPS members more quickly and cheaply than the SMR, as the Ormat projects alone would generate 1,050,346 MWh annually compared to the 932,064 MWh the UAMPS members are subscribed to purchase from the SMR.
  • Geothermal energy provides the same 'firm, dispatchable energy' and reliability that UAMPS seeks from nuclear power, with the Eavor Inc. closed-loop system specifically offering load-following capabilities that allow it to operate in either a baseload or dispatchable manner.
  • The NuScale SMR project carries high financial risk because UAMPS members are contractually bound to pay final costs regardless of the amount, whereas the geothermal proposals are flat-rate contracts based on proven technology.

Cite the original document

APA
Wamsted, D. (2023). Geothermal resources offer ramp from risky, costly nuclear project. Institute for Energy Economics and Financial Analysis. https://ieefa.org/resources/geothermal-resources-offer-ramp-risky-costly-nuclear-project
Chicago
Wamsted, Dennis. Geothermal resources offer ramp from risky, costly nuclear project. Institute for Energy Economics and Financial Analysis, 2023. https://ieefa.org/resources/geothermal-resources-offer-ramp-risky-costly-nuclear-project.
Wikipedia
{{cite press release |last1=Wamsted |first1=Dennis |title=Geothermal resources offer ramp from risky, costly nuclear project |publisher=Institute for Energy Economics and Financial Analysis |date=10 January 2023 |url=https://ieefa.org/resources/geothermal-resources-offer-ramp-risky-costly-nuclear-project |access-date=5 November 2026 |via=Climate Insights Directory (document ieefa-000630)}}
BibTeX
@misc{wamsted2023geothermal, author = {Wamsted, Dennis}, title = {{Geothermal resources offer ramp from risky, costly nuclear project}}, publisher = {Institute for Energy Economics and Financial Analysis}, year = {2023}, month = jan, url = {https://ieefa.org/resources/geothermal-resources-offer-ramp-risky-costly-nuclear-project}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document ieefa-000630} }

Full text

Collected · Record updated