Duke Energy’s costly Edwardsport coal gasification project continues
Summary
Duke Energy's Edwardsport coal gasification plant has cost ratepayers over $1.4 billion more than market prices for power, with operating costs averaging $60 per MWh.
Key insights
- Between June 2013 and December 2017, the all-in cost of power from the Edwardsport plant averaged $145 per MWh, significantly exceeding the market average of $32 per MWh.
- Indiana ratepayers paid more than $1.4 billion extra for power from the Edwardsport plant compared to purchasing the same energy and capacity from competitive wholesale markets in the MISO region.
- The plant's operating and maintenance costs alone have averaged $60 per MWh since opening, and it has failed to meet performance metrics regarding heat rate, capacity factor, equivalent forced outage rate, and syngas availability.
- The plant is technically uneconomical unless it operates at a net capacity factor of 82% or more when using syngas, but it is currently operating at barely half that factor.
- The economic viability of Edwardsport is expected to decline further due to low natural gas prices and the decreasing costs of wind and solar energy on the MISO grid.
Cite the original document
- APA
- Schlissel, D. (2018). Duke Energy’s costly Edwardsport coal gasification project continues. Institute for Energy Economics and Financial Analysis. https://ieefa.org/resources/ieefa-update-duke-energys-costly-edwardsport-coal-gasification-project-continues
- Chicago
- Schlissel, David. Duke Energy’s costly Edwardsport coal gasification project continues. Institute for Energy Economics and Financial Analysis, 2018. https://ieefa.org/resources/ieefa-update-duke-energys-costly-edwardsport-coal-gasification-project-continues.
- Wikipedia
- {{cite press release |last1=Schlissel |first1=David |title=Duke Energy’s costly Edwardsport coal gasification project continues |publisher=Institute for Energy Economics and Financial Analysis |date=1 August 2018 |url=https://ieefa.org/resources/ieefa-update-duke-energys-costly-edwardsport-coal-gasification-project-continues |access-date=5 November 2026 |via=Climate Insights Directory (document ieefa-000627)}}
- BibTeX
- @misc{schlissel2018duke, author = {Schlissel, David}, title = {{Duke Energy’s costly Edwardsport coal gasification project continues}}, publisher = {Institute for Energy Economics and Financial Analysis}, year = {2018}, month = aug, url = {https://ieefa.org/resources/ieefa-update-duke-energys-costly-edwardsport-coal-gasification-project-continues}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document ieefa-000627} }
Full text
Collected · Record updated