Puerto Rico: New natural gas deal fits same old pattern of choosing contractors
Summary
The IEEFA argues that PREPA's contract with New Fortress Energy for the San Juan power plant conversion lacks transparency and rigorous analysis, suggesting a pattern of politically driven contracting.
Key insights
- The Puerto Rico Electric Power Authority (PREPA) awarded a contract to New Fortress Energy to convert two units at the San Juan power plant from oil to natural gas, including the necessary infrastructure and fuel delivery under a five-year contract.
- The contracting process bypassed PREPA's long-term integrated resource planning, meaning no analysis was conducted on how the conversion would affect other system units or what alternative generation options existed.
- Projected fuel savings are contradictory, with PREPA estimating $150 million per year in a filing with the Puerto Rico Energy Bureau, while New Fortress Energy estimated $285 million per year in an SEC filing.
- New Fortress Energy is a relatively new company established in 2018 with no history of doing business in Puerto Rico and is currently unprofitable, yet it was selected over more established companies with better credit ratings and local experience.
Cite the original document
- APA
- Sanzillo, T., & Kunkel, C. (2019). Puerto Rico: New natural gas deal fits same old pattern of choosing contractors. Institute for Energy Economics and Financial Analysis. https://ieefa.org/resources/ieefa-puerto-rico-new-natural-gas-deal-fits-same-old-pattern-choosing-contractors
- Chicago
- Sanzillo, Tom, and Cathy Kunkel. Puerto Rico: New natural gas deal fits same old pattern of choosing contractors. Institute for Energy Economics and Financial Analysis, 2019. https://ieefa.org/resources/ieefa-puerto-rico-new-natural-gas-deal-fits-same-old-pattern-choosing-contractors.
- Wikipedia
- {{cite press release |last1=Sanzillo |first1=Tom |last2=Kunkel |first2=Cathy |title=Puerto Rico: New natural gas deal fits same old pattern of choosing contractors |publisher=Institute for Energy Economics and Financial Analysis |date=22 January 2019 |url=https://ieefa.org/resources/ieefa-puerto-rico-new-natural-gas-deal-fits-same-old-pattern-choosing-contractors |access-date=5 November 2026 |via=Climate Insights Directory (document ieefa-000554)}}
- BibTeX
- @misc{sanzillo2019puerto, author = {Sanzillo, Tom and Kunkel, Cathy}, title = {{Puerto Rico: New natural gas deal fits same old pattern of choosing contractors}}, publisher = {Institute for Energy Economics and Financial Analysis}, year = {2019}, month = jan, url = {https://ieefa.org/resources/ieefa-puerto-rico-new-natural-gas-deal-fits-same-old-pattern-choosing-contractors}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document ieefa-000554} }
Full text
Collected · Record updated