Ill-fated Petra Nova CCS project: NRG Energy throws towel
Summary
The Petra Nova CCS project is described as a failure after NRG Energy sold its 50 percent stake for $3.6 million, representing less than 0.5% of the project's $1 billion construction cost.
Key insights
- NRG Energy sold its 50 percent stake in the Petra Nova carbon capture plant for approximately $3.6 million, which is less than 0.5% of the project's total construction cost of roughly $1 billion.
- While the target CO2 capture rate for Petra Nova was 90%, EPA emissions data suggests the actual rate was likely between 65% and 70%, and potentially as low as 55% to 58% when including emissions from the gas-fired combustion turbine powering the facility.
- The project failed to meet its target operational uptime of 85% due to technical problems and downtime across the CCS facility, the W.A. Parish Unit 8 plant, the CO2 pipeline, and the injection oilfield.
- The U.S. Department of Energy invested $195 million in the project, but NRG Energy recorded impairment charges totaling $310 million between 2016 and 2019, effectively writing off its investment.
- Other CCS projects have faced similar failures, such as Southern Co.’s Kemper project, where costs rose from $3 billion to $7.5 billion and the CCS portion was eventually scrapped.
Cite the original document
- APA
- Schlissel, S. M. D. (2022). Ill-fated Petra Nova CCS project: NRG Energy throws towel. Institute for Energy Economics and Financial Analysis. https://ieefa.org/resources/ill-fated-petra-nova-ccs-project-nrg-energy-throws-towel
- Chicago
- Schlissel, Suzanne Mattei David. Ill-fated Petra Nova CCS project: NRG Energy throws towel. Institute for Energy Economics and Financial Analysis, 2022. https://ieefa.org/resources/ill-fated-petra-nova-ccs-project-nrg-energy-throws-towel.
- Wikipedia
- {{cite press release |last1=Schlissel |first1=Suzanne Mattei David |title=Ill-fated Petra Nova CCS project: NRG Energy throws towel |publisher=Institute for Energy Economics and Financial Analysis |date=5 October 2022 |url=https://ieefa.org/resources/ill-fated-petra-nova-ccs-project-nrg-energy-throws-towel |access-date=5 November 2026 |via=Climate Insights Directory (document ieefa-000530)}}
- BibTeX
- @misc{schlissel2022illfated, author = {Schlissel, Suzanne Mattei David}, title = {{Ill-fated Petra Nova CCS project: NRG Energy throws towel}}, publisher = {Institute for Energy Economics and Financial Analysis}, year = {2022}, month = oct, url = {https://ieefa.org/resources/ill-fated-petra-nova-ccs-project-nrg-energy-throws-towel}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document ieefa-000530} }
Full text
Collected · Record updated