The Australian Renewable Energy Scorecard for Q2 2026 finds that while the pipeline of wind, solar, and battery projects exceeds the capacity needed for the 82% renewables target, actual construction is lagging significantly. A critical bottleneck is the lack of power purchase agreements (PPAs), with only 6% of fully approved projects being contracted. Government underwriting schemes like the Capacity Investment Scheme (CIS) have not yet translated into high construction rates, as only 2,811MW of underwritten capacity has progressed to construction or operation. Conversely, rooftop solar and small-scale battery installations hit record highs in Q2 2026, driven by the Cheaper Home Battery Program (CHBP).

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • The total capacity of wind and solar projects currently in development exceeds the amount required to meet the federal government's 82% renewables target, although solar capacity in Tasmania is only at the required level.
  • There is a significant gap between approved capacity and actual construction; in New South Wales, Victoria, Tasmania, and Western Australia, projects under construction represent less than 10% of the new operational capacity needed by 2030.
  • The primary obstacle preventing approved projects from reaching construction is the failure to secure power purchase agreements (PPAs), with only 6% of fully approved projects across main grids having been contracted.
  • Government underwriting via the Capacity Investment Scheme (CIS) and NSW state schemes has not effectively accelerated construction; of the nearly 25,500 MW awarded underwriting agreements, only 2,811 MW have progressed to being operational or under construction.
  • Large-scale battery projects in development exceed the 82% target requirements, but there is a capacity gap of approximately 80% between current construction and the operational capacity required by 2030.
  • Rooftop solar and small-scale battery installations reached record highs in the second quarter of 2026, attributed to the Cheaper Home Battery Program (CHBP), though a rebate reduction in May 2026 led to a subsequent drop in installation numbers and system sizes.
  • Large-scale renewable and battery projects currently under construction are generating $6 billion in direct domestic investment and providing 15,600 job years of employment (equivalent to 7,800 full-time jobs).

Cite the original document

APA
Institute for Energy Economics and Financial Analysis (2026). Australian Renewable Energy Scorecard. https://ieefa.org/australian-renewable-energy-scorecard
Chicago
Institute for Energy Economics and Financial Analysis. Australian Renewable Energy Scorecard. 2026. https://ieefa.org/australian-renewable-energy-scorecard.
Wikipedia
{{cite report |author=Institute for Energy Economics and Financial Analysis |title=Australian Renewable Energy Scorecard |date=September 2026 |url=https://ieefa.org/australian-renewable-energy-scorecard |access-date=5 November 2026 |via=Climate Insights Directory (document ieefa-000288)}}
BibTeX
@techreport{instituteforenergyeconomicsandfinancialanalysis2026australian, author = {{Institute for Energy Economics and Financial Analysis}}, title = {{Australian Renewable Energy Scorecard}}, institution = {Institute for Energy Economics and Financial Analysis}, year = {2026}, month = sep, url = {https://ieefa.org/australian-renewable-energy-scorecard}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document ieefa-000288} }

Full text

Collected · Record updated