Five years after Hurricane Maria: progress being made by people, not institutions
Summary
Five years after Hurricane Maria, Puerto Rico's energy transition is led by over 40,000 households installing rooftop solar, while government and private utility efforts have failed to lower costs or build utility-scale renewables.
Key insights
- Since September 2017, more than 40,000 households in Puerto Rico have installed distributed rooftop solar, totaling over 250 megawatts (MW) of capacity, mostly including battery storage for resiliency.
- Grid-connected rooftop solar currently accounts for 3.7% of Puerto Rico's electricity consumption, which exceeds the contribution of utility-scale projects.
- Despite a 2020 integrated resource plan prioritizing renewables, no new utility-scale renewable energy projects have been built, and the government continues to prioritize natural gas, including a recent call for proposals for a 300-MW natural gas plant.
- The privatization of the grid via LUMA Energy has failed to lower electricity rates, which have exceeded 30 cents per kilowatt-hour—10 cents above the target rate—and has resulted in unreliable service.
- The only major centralized power project implemented since Hurricane Maria was the conversion of two San Juan power plant units to natural gas and the development of an LNG import terminal by New Fortress Energy, a project marked by illegal construction and delivery failures.
Cite the original document
- APA
- Sanzillo, T. (2022). Five years after Hurricane Maria: progress being made by people, not institutions. Institute for Energy Economics and Financial Analysis. https://ieefa.org/resources/five-years-after-hurricane-maria-progress-being-made-people-not-institutions
- Chicago
- Sanzillo, Tom. Five years after Hurricane Maria: progress being made by people, not institutions. Institute for Energy Economics and Financial Analysis, 2022. https://ieefa.org/resources/five-years-after-hurricane-maria-progress-being-made-people-not-institutions.
- Wikipedia
- {{cite press release |last1=Sanzillo |first1=Tom |title=Five years after Hurricane Maria: progress being made by people, not institutions |publisher=Institute for Energy Economics and Financial Analysis |date=13 September 2022 |url=https://ieefa.org/resources/five-years-after-hurricane-maria-progress-being-made-people-not-institutions |access-date=5 November 2026 |via=Climate Insights Directory (document ieefa-000218)}}
- BibTeX
- @misc{sanzillo2022five, author = {Sanzillo, Tom}, title = {{Five years after Hurricane Maria: progress being made by people, not institutions}}, publisher = {Institute for Energy Economics and Financial Analysis}, year = {2022}, month = sep, url = {https://ieefa.org/resources/five-years-after-hurricane-maria-progress-being-made-people-not-institutions}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document ieefa-000218} }
Full text
Collected · Record updated