Summary

AI-generated

This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.

Learn more about AI enrichment

The IEEFA concludes that the proposal to repower the Cayuga Power Plant is financially unviable and would not benefit ratepayers, as it would require over $265 million in subsidies by 2027.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • The repowered Cayuga plant would be uneconomic to operate without ongoing ratepayer-supplied subsidies; by the end of the 10-year repowering period in 2027, New York State Electric and Gas (NYSEG) customers would have paid more than $265 million to keep the plant operational, with a risk of further subsidies beyond that term.
  • Transmission upgrades recommended by NYSEG to address grid reliability concerns are necessary regardless of whether the Cayuga plant is repowered, which nullifies the argument for using ratepayer subsidies for the repowering project.
  • Claims that repowering would provide fuel diversity and savings in energy and capacity costs are unsubstantiated or illusory, and there are more cost-effective alternatives for maintaining jobs, the local tax base, and grid reliability.

Cite the original document

APA
Kunkel, D. S. C. (2015). Executive Summary. Institute for Energy Economics and Financial Analysis. https://ieefa.org/resources/losing-proposition-why-proposal-repower-cayuga-plant-should-be-rejected
Chicago
Kunkel, David Schlissel Cathy. Executive Summary. Institute for Energy Economics and Financial Analysis, 2015. https://ieefa.org/resources/losing-proposition-why-proposal-repower-cayuga-plant-should-be-rejected.
Wikipedia
{{cite report |last1=Kunkel |first1=David Schlissel Cathy |title=Executive Summary |publisher=Institute for Energy Economics and Financial Analysis |date=1 August 2015 |url=https://ieefa.org/resources/losing-proposition-why-proposal-repower-cayuga-plant-should-be-rejected |access-date=5 November 2026 |via=Climate Insights Directory (document ieefa-000160)}}
BibTeX
@techreport{kunkel2015executive, author = {Kunkel, David Schlissel Cathy}, title = {{Executive Summary}}, institution = {Institute for Energy Economics and Financial Analysis}, year = {2015}, month = aug, url = {https://ieefa.org/resources/losing-proposition-why-proposal-repower-cayuga-plant-should-be-rejected}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document ieefa-000160} }

Full text

Collected · Record updated